Description |
|
There must be a Facility Plant Replacement Value Amount recorded for each valid RPA Type Code value of "B" (Building), "S" (Structure), or "LS" (Linear Structure).
The Facility Plant Replacement Value amount must be recorded to the nearest dollar, and reported to the nearest thousand dollars.
The value reported for Facility Plant Replacement Value Amount must be greater than one (1) except for those FAC codes where the cost factor is zero (0) as listed in the UFC 3-701-XX.
Each Facility Plant Replacement Value (PRV) must be recalculated annually. |
Comments |
Business Rule Extra Properties |
|
Business Rule Number: | 720087 |
APG Compliant? | |
Business Rule Category: | Action Assertion |
Business Rule Level: | Operational |
Business Rule Source Type: | Compliance Requirement |
Reference Material: | |
|
CBM Stakeholder(s) (1) |
|
RPILM |
Enterprise Standard(s) (0) |
|
|
LRP (0) |
|
|
BPM Process(es) (0) |
|
|
Condition(s) (0) |
|
|
Measure Type(s) (0) |
|
|
Data Object(s) (0) |
|
|
Data Element(s) (0) |
|
|
Attribute(s) / Entity (0) |
|
|
Gateway(s) (0) |
|
|
Data Structure(s) (0) |
|
|