RPILM 

Type - CBM
Description: The Real Property and Installations Lifecycle Management provides the warfighter and Core Business Missions (CBM) access to near-real time secure, accurate and reliable information on real property assets and environment, safety and occupational health sustainability. 
Long Name: Real Property and Installations Lifecycle Management 

CBM - BPM Events

Count:302

BPM Events
Accept Goods and Services to Administer the Contract Events
Acceptable Discrepancies
Acceptance Evidence Sent
Acceptance Information
Acceptance Procedures Initiated
Acceptance Results
Acceptance Results with Discrepancies
Accepted Agreement Received
Accepted Discrepancies
Accepted Intragovernmental Agreement Received
Accepted Intragovernmental Order Received
Accepted Intragovernmental Order Sent
Accepted Intragovernmental Order to External Sent
Accepted Purchase Request Received
Accepted Purchase Request Sent
Accounts Payable Pro Forma Entries Sent
Accrued Liability Pro Forma Entries Sent
Acknowledge Goods Tendered and Services Rendered Initiated
Acknowledged Intragovernmental Order Received
Acknowledgement Initiated
Acquisition Requirement
Additional Initial Asset Record Required
Adjustment to be Made Sent
Administer the Contract Starting Event
Administer the Contract to Execute Contract Events
Administer the Contract to Monitor and Improve Process Events
Administrative Procurement Change Request Received
Administrative Procurement Change Request Sent
Advance Ship Notice Information Received
Advice of Payment Requested
Aggregated Spend Information
Agreement Modification not Required
Anticipated Adjustment
Approved Billing Document Sent
Approved Payment Request
Approved Payment Request Sent
Approved Request for Proposal Received
Approved Sourcing Plan Needing New Agreement
Approved Sourcing Plan Received
Approved Sourcing Plan Sent
Approved Sourcing Plan for Non Micropurchase Requirement
Approved Sourcing Plan with Existing Agreement
Archived Intragovernmental Order
Archived Intragovernmental Order Received
Archived Procurement Instrument Received
Arrival Information Sent
Asset Accountability Initiated
Asset Information Maintenance Initiated
Asset Record Archived
Asset Record Created
Asset Record Does Not Exist
Asset Record Received
Asset Record Updated
Asset Recorded Cost Information Communicated
Asset Valuation Information Received
Asset Valuation Initiated
Authorization to Receive Financing Payment
Authorization to Receive Financing Payment Received
Awarded Agreement
Awarded Procurement Instrument or Supplemental Procurement Instrument Received
Awarded Procurement Instrument or Supplemental Procurement Instrument Sent
Build Make Maintenance Sustainment Evidence
Business System Approval or Disapproval
Buyer Approved Intragovernmental Order Sent
CBM Requirements Identified
CIP and or WIP Account Updated
CIP and or WIPAccount Created
CSE Initiating Events
CSE Initiating Update CIP and or WIP Account
Cancel Payment Request Returned
Cancel Payment Request Sent
Categorized Requirements Received
Categorized Requirements Sent
Certified Human Resources Management Pay Information
Collection Pro Forma Entries Sent
Commitment Modification Request Sent
Confirmation of Physically Complete Procurement Instrument Received
Confirmation of Physically Complete Procurement Instrument Sent
Confirmation of Reimbursable Authority Received
Confirmed Contract Fulfillment Sent
Construction Requirement
Construction Restoration Modernization or Space Assignment or Reversion
Contract Action Report Sent
Contract Administration Initiated
Contract Closure Information
Contract Execution Initiated
Contract Modification Received
Contract Specification
Contract or Order Closeout Initiated
Contract or Order Closure Information Received
Contractor Receipt of Government Furnished Property
Coordinated Agreement
Coordination not Required
Correcting Pro Forma Entries Sent
Cost Basis of Asset
Cost Model Template Request Received
Current Value
Customer and Vendor Information Received
Deployed ESOH Solution
Design Authorization Received
Design Bid Build Construction Restoration and Modernization Contract or Order
Develop Sourcing Strategy Resulting Events
Disapproved Payment Requests Received
Disapproved Payment Requests Sent
Discrepancy Dispute Update
Discrepancy Report Received
Discrepancy Report Sent
Disposal Evidence
Disposal Requirement
Disposition Information Sent
Disposition of Loss
DoD Supplier Response
ESOH Issue Description Received
End ESOH Operations
Environmental Liability Cost Information
Environmental Liability Information
Environmental Liability Transaction Information Received
Evidence of Goods Tendered
Evidence of Goods Tendered and Services Rendered from External Received
Evidence of Goods Tendered and Services Rendered Received
Evidence of Goods Tendered and Services Rendered Sent
Excess Real Property Declaration
Execute Contract to Administer the Contract Events
Execute Sourcing Strategy to Manage Sales and Procurement Events
Execute Sourcing Strategy to Process Requirement Events
External Carrier Information Received
External Shipping Information Received
Federal Dollars Expended on Non Federal Asset
File Discrepancy Report Initiated
Final Invoice Payment Notice Received
Finalizing Acceptance Initiated
Financial Management Policy Requested
Funds Availability Request Received
Funds Availability Request Sent
Gain or Loss on Sale of Investment Sent
Gift or Donation or Other
Goods and Services Acceptance Initiated
Goods and Services Acknowledgement Received
Goods and Services Acknowledgement Sent
Goods or Services Received
Government Furnished Materiel Request Received
Government Solicitation Received
Government Solicitation Request
Housing Entitlement Notification Sent
Incomplete Delivery
Individual Debt Information Sent
Individual Training Course Resource Requirements Information Received
Individual Training and Education Procurement Request Sent
Information from External Sources
Initial Asset Record
Inspected Goods and Service Evidence with Discrepancies
Inspected Goods and Service Evidence with no Discrepancies
Interim or Final Acceptance Code
Intragovernmental Change Requirement Sent
Intragovernmental Order Closure Authorization
Intragovernmental Order Closure Information
Intragovernmental Order Closure Notice
Invalid Payment
Investment Payment Request
Invoice for Goods
Legal for Review
Logistics Order Modification Received
Logistics Order Received
Logistics Order Sent
MILCON Awarded Design Bid Build Contract or Order
MILCON Awarded Design Build Contract or Order
Manage Sales and Procurement to Dispose or Return Property and Materiel Events
Manage Sales and Procurement to Perform Asset Accountability Events
Manage Sales and Procurement to Perform Build and Make Events
Manage Sales and Procurement to Process Requirement Events
Materiel and Forces Status Information Received
Materiel and Forces Status Information Sent
Military Interdepartmental Purchase Request Received
Military Interdepartmental Purchase Request Sent
Minor Construction Approved
Minor Construction Awarded Contract or Order
Minor Construction Inhouse
Modification or Change Notification
Modification or Change Requirement
Monitor and Improve Process Starting Events
New Cost Model Published
New Data Element Requested
No Solution Needed End
Non CIP Expense
Not Usably Complete
Notification of Disbursement Sent
Notification of Final Delivery
Notification of Funds Availability Received
Notification of Loss from Supplier
Notification of Payment Cancellation Sent
Obligation Request Received
Offset Pro Forma Entries Sent
Order Performance Evidence Sent
Order Status Sent
Payment Confirmation Sent
Payment Confirmed
Perform Asset Accountability Initiated
Period of Performance End
Physical Asset Record Updated
Physical Inventory Adjustment
Physical Inventory Required
Plant Clearance Disposition Received
Plant Clearance Disposition Sent
Plant Clearance Schedule
Pre Payment Information Received
Pre Solicitation Notice Sent
Procurement Change Request Received
Procurement Change Request Sent
Procurement Instrument Archived
Procurement Instrument Closure Information Sent
Procurement Instrument Execution Information Received
Procurement Instrument Execution Information from External Received
Procurement Instrument Performance Information Received
Procurement Instrument Performance Information Sent
Procurement Request
Program and Funding Document Received
Project Approval Requested
Project Cancellation Cost
Project Cancellation Evidence
Project Cancelled
Project Deferred
Project Deferred Received
Project Not Approved
Project Not Approved Received
Project Review Required
Property Disposal Decision
Proposal Received
Public Draft Request for Proposal Sent
Purchase Request Received
Purchase Request Sent
RPA to FV Initiating Events
Ready to Pay File Rejected
Ready to Pay File Rejected Notice Received
Real Property Asset Condition Update
Real Property Asset Record Updated
Real Property Asset Valuation Information
Real Property Asset Valuation Information Received
Real Property Discrepancy Report Received
Real Property Operation Ceased Notification
Real Property Outgrant Evidence
Real Property Placed in Service Notification
Real Property Placed in Service Notification Sent
Receive ESOH Control Requirement
Receive Goods and Services to Accept Goods and Services Events
Receive Goods and Services to Administer the Contract Events
Receive Real Property Installed Equipment Recovered Notification
Refined Requirement Sent
Rejected Environmental Liability Information
Rejected Purchase Request Sent
Rejection of Goods or Services Notification Received
Rejection of Goods or Services Notification Sent
Replenishment Stock Request Received
Request Advice of Payment
Request Certified Business Partner Payment
Request for Disposition Received
Request for Increased Reimbursable Authority
Request for Proposal Comments Received
Request for Proposal Released
Request for Refund
Requirement Change from Sourcing Received
Requirement Change from Sourcing Sent
Requirement Fulfilled
Requirement Processing Initiated
Requirement Received
Response from Legal
Responsive Proposal Received
Return Delivery Order
Returned Cancel Payment Request Sent
Returned Payment Notice
Returned Payment for Re-Disbursement
Returned Payment for Rescheduling
Revenue Data Sent
Sales and Procurement Management Initiated
Service Procurement Request Received
Service Procurement Request Sent
Signed Intragovernmental Agreement Sent
Solicitation Required
Solicitation not Required
Source Selected for IGT Order
Sourcing Strategies Improvement Initiated
Sourcing Strategy Execution Initiated
Spend Information Sent
Start Perform ESOH Services
Stop Payment Notification Received
Summarized Balance of Accounts for Procurement Received
Summarized Balance of Accounts for Procurement Sent
Supply Request
Technical Surveillance for Service
Time and Materiel Surveillance
Transfer of Government Property
Transportation Information Received
Transportation Information Sent
Updated Asset Information
Updated Maintenance or Production Schedule Received
Usably Complete
Valuation Template Created or Updated
Valuation Template Required
WIP Account Relieved
Withhold or Holdback Payment
Withhold or Holdback Payment Received
Work Order Authorized
Work Order Not Authorized

CBM - BPM Processes

Count:122

BPM Processes
Accept Goods and Services
Acknowledge Goods Tendered and Services Rendered
Acknowledge Real Property Services Rendered
Administer Procurement Instrument
Aggregate Asset Inventory Count Results
Aggregate Initial Asset Information
Aggregate Real Property Management Information
Analyze Facility Energy Consumption
Approve Asset Inventory Count Information
Archive Asset Record
Assess ESOH Risk
Assign and Generate Unique Identification
Associate Project Identification to Appropriate CIP Account
Associate Project Identification to Appropriate WIP Account
Authorize Return or Disposal
Authorize Work Order
Award Procurement Instrument
Certify Discrepancies
Classify Work
Complete Review and Approve Final Design Solution
Conduct Architectural Design
Conduct Inspection Walkthrough Examination and Verification of System Operation
Conduct Physical Inventory
Conduct Program Management
Confirm Proof of Training
Confirm Receipt of Acquisition Information
Confirm Receipt of Graphic Information
Confirm Receipt of Operation and Maintenance Information
Confirm Receipt of Regulatory Compliance Information
Confirm Receipt of Uniform Relocations Act Information
Consolidate Discrepancies
Count Assets
Create CIP and or WIP Account
Create Initial Asset Record
Create Purchase Requisition
Define Asset Data Elements
Define Work
Define and Record Discrepancies
Define and Validate Asset Data Relationships
Define and Validate Asset Data Structure
Determine Energy Conservation Measure Implementation Schedule
Determine Facility Energy Consumption Parameters
Determine If CIP and or WIP Account is Required
Determine Other Valuation Methods
Determine Renewable Energy Project Schedule
Determine Renewable Energy Purchase Requirement
Develop ESOH Control Agreement
Develop ESOH Solution
Develop Procurement Strategy
Develop and Update Work Order
Dispose Property or Materiel
Dispose or Return Property and Materiel
Establish CIP and or WIP Account
Establish and Update Valuation Conventions
Estimate Time and Cost of Corrective Actions
Execute Acceptance Transactions
Execute Requisition
File Discrepancy Report
Finalize Acceptance
Identify Accepting Officials
Identify Inspection and Verification Participants
Identify Property and Materiel for Return or Disposal
Identify and Reserve Supply Chain Resources
Implement ESOH Solution
Maintain Asset Information
Maintain Environmental Liabilities Cost Information
Maintain Environmental Liability Site or Item Information
Manage Energy Goals
Manage Energy Reporting
Manage Inbound and Outbound Shipments
Manage Renewable Energy Purchase
Manage Sales and Procurement
Notify Accepting Officials
Perform Acceptance Procedures
Perform Asset Accountability
Perform Asset Valuation
Perform Build and Make and Maintenance and Sustainment
Perform Construction Restoration Modernization
Perform ESOH Aspect Assessment
Perform ESOH Aspect Identification
Perform ESOH Services
Perform Energy Analytics
Perform Energy Project Measurement and Verification
Perform Facility Energy Review
Perform Inspection and Testing and Verification
Perform Installations Support
Perform Instrument Closeout
Perform Physical Asset Accountability
Perform Quality Assurance on Aggregated Information
Perform Real Property Inspections and Verifications
Perform Receipt, Acceptance, and Return
Perform Renewable Energy Measurement and Verification
Perform Root Cause Analysis and Reform Inventory Control Procedures
Perform Site Renewable Energy Assessment
Populate Asset Data Elements
Prepare Detailed Scope and Current Working Estimate
Prepare Environmental Liabilities Information for Financial Reporting
Process and Submit Validated Evidence
Receive Design Approval Response
Receive Goods and Services
Receive Project Evidence
Receive and Prioritize Requirements
Record CIP and or WIP Financial Transactions
Record Facility Energy Consumption
Relieve CIP and or WIP Account
Relieve Military Equipment Valuation
Request Design Approval Per Milestone
Review Asset Inventory Count Results
Review and Inspect Design
Schedule Closing or Signing with Provider
Schedule Inspections and Verifications
Schedule Return or Disposal
Select Energy Conservation Measures to Implement
Select Renewable Energy Projects to Implement
Transport Materiel and Forces
Update Asset Record
Update CIP and or WIP Account
Update Military Equipment Valuation
Validate Account Structure
Validate Asset Data Elements
Verify Commissioning Requirements
Verify Title Search

CBM - Business Capabilities

Count:40

Business Capabilities
Airfield Management
Base Physical Security
Base Support Vehicles and Equipment
Base and Installations Support
Combat Engineering
Defeat Explosive Hazards
Deny Movement and Maneuver
Develop and Maintain Facilities
Disposal of Installation Assets
Dispose or Return Property and Materiel
Emergency Services
Engineering
Enhance Survivability
Enterprise Energy Information Management
Environmental Liabilities Identification and Valuation
Establish Lines of Communications
Facilities Support
General Engineering
Geospatial Engineering
Global Access Engineering
Harden Key Infrastructure and Facilities
Hazardous Materials Process Controls and Information Management
Housing Services
Installation Geospatial Information and Services
Installation Safety
Installation Services
Law Enforcement
Manage Receipt and Acceptance
Master Facility Design
Operate the Joint Deployment and Distribution Enterprise
Port Services
Provide Installation Assets
Range Management
Real Property Accountability
Real Property Life Cycle Management
Recapitalization of Installation Assets
Repair and Restore Infrastructure
Security Services
Sustainment of Installation Assets
Utilize Geospatial Data

CBM - Business Rules

Count:761

Business Rules
3d_Party_Mechanism_Duration
Absence_Information_Study
Acceptance_By_Contracting Officer
Acquisition_Basic_Cost
Acquisition_Basic_Cost_Derivation
Acquisition_Cost_To_Government_Amount
Acquisition_Cost_To_Government_Amount_Derivation
Acquisition_Date
Acquisition_Date_Derivation
Acquisition_Fund_Source_Code
Acquisition_Fund_Source_Code_Derivation
Acquisition_Method_Code
Acquisition_Method_Code_Derivation
Acquisition_Organization_Code
Acquisition_Organization_Code_Derivation
Acquisition_Original_Asset_Record
Acquisition_Original_Asset_Recorded_Cost_Amount
Acquisition_Original_Asset_Recorded_Cost_Amount_Derivation
Acquisition_Plan_Developed
Acre_Value
Address_Street_Direction_Code
Address_Street_Direction_Code_Derivation
Address_Street_Direction_from_SOR
Address_Street_Name
Address_Street_Name_Derivation
Address_Street_Name_from_SOR
Address_Street_Number_Derivation
Address_Street_Number_from_SOR
Address_Street_Type_Code_Derivation
Address_Street_Type_Code_from_SOR
Address_Type_Code
Address_Type_Code_Derivation
Address_Unit_Number
Address_Unit_Number_Derivation
Addressee_Title_Name
Addressee_Title_Name_Derivation
Adjust_PPE_Value
Allocation_Category_Code
Allocation_Sustainment_Code
Amortization_Lease_Management_System
Ancillary_Cost_Expenditure
Approval_Authority
Approval_Authority_Derivation
Area_Marked_Signage
Asset_Allocation_Current_Use_CATCODE_Code
Asset_Allocation_Current_Use_CATCODE_Code_Derivation
Asset_Allocation_Current_Use_FAC_Code
Asset_Allocation_Current_Use_FAC_Code_Derivation
Asset_Allocation_Current_Use_FAC_Code_from_SOR
Asset_Allocation_Operational_Fund_Source_Code
Asset_Allocation_Operational_Fund_Source_Code_Derivation
Asset_Allocation_Operational_Funding_Organization_Code
Asset_Allocation_Operational_Funding_Organization_Code_Derivation
Asset_Allocation_Shared_Use_Indicator
Asset_Allocation_Shared_Use_Indicator_Derivation
Asset_Allocation_Size_Quantity
Asset_Allocation_Size_Quantity_Derivation
Asset_Allocation_Size_Quantity_from_SOR
Asset_Allocation_Size_UOM_from_SOR
Asset_Allocation_Size_Unit_Of_Measure_Code
Asset_Allocation_Size_Unit_Of_Measure_Code_Derivation
Asset_Allocation_Standard_Code
Asset_Allocation_Sustainment_Fund_Code
Asset_Allocation_Sustainment_Fund_Code_Derivation
Asset_Allocation_Sustainment_Organization_Code
Asset_Allocation_Sustainment_Organization_Code_Derivation
Asset_Allocation_User_Org_Code_from_SOR
Asset_Allocation_User_Organization_Code
Asset_Allocation_User_Organization_Code_Derivation
Asset_Configuration_Design_Use_CATCODE_Code
Asset_Configuration_Design_Use_CATCODE_Code_Derivation
Asset_Configuration_Design_Use_FAC_Code
Asset_Configuration_Design_Use_FAC_Code_Derivation
Asset_Configuration_Design_Use_Size_Quantity
Asset_Configuration_Design_Use_Size_Quantity_Derivation
Asset_Configuration_Design_Use_Total_Size_Unit_Of_Measure_Code
Asset_Configuration_Design_Use_Total_Size_Unit_Of_Measure_Code_Derivation
Asset_Construction_Agent_Code
Asset_Construction_Agent_Code_Derivation
Asset_Review_Date_from_SOR
Asset_Review_Fair_Market _Value_Amount
Asset_Review_Fair_Market _Value_Amount_Derivation
Asset_Review_Type_from_SOR
Assign_Installation_Code
Assign_Installation_Name
Assign_New_Identifier
Assign_Site_Code
Assign_Site_Name
Award_Signatures_Required
Awarding_IDC_Contracts
BRAC_Action_Type_Code
BRAC_Action_Type_Code_Derivation
BRAC_Round_Year
BRAC_Round_Year_Derivation
BRAC_Statutory_Fiscal_Year_Date
BRAC_Statutory_Fiscal_Year_Date_Derivation
Building_Module_Bedroom_Quantity
Building_Module_Bedroom_Quantity_Derivation
Building_Module_Full_Bathroom_Quantity
Building_Module_Full_Bathroom_Quantity_Derivation
Building_Module_Identifier_from_SOR
Building_Module_One_Half_Bathroom_Quantity
Building_Module_One_Half_Bathroom_Quantity_Derivation
Building_Module_Three_Quarter_Bathroom_Quantity
Building_Module_Three_Quarter_Bathroom_Quantity_Derivation
Building_Module_Type_Code
Building_Module_Type_Code_Derivation
Building_Module_Type_from_SOR
Building_Module_Unit_Handicapped_Accessible_Indicator
Building_Module_Unit_Handicapped_Accessible_Indicator_Derivation
CIP_Abeyance
CIP_Acceptance_Documentation
CIP_Acceptance_Documentation_2
CIP_Accumulated_Costs_To_Date_Derivation
CIP_Additional_Project_Costs
CIP_Another_Agency
CIP_Asset_Placed_In_Service
CIP_Asset_Placed_In_Service_PPE
CIP_Asset_Placed_In_Service_PPE_1
CIP_Audit_Trail_1
CIP_Audit_Trail_2
CIP_Audit_Trail_3
CIP_Contract_Provision_1
CIP_Contract_Provision_2
CIP_Cost_Allocation
CIP_Cost_Phase
CIP_Cost_Reimbursable_CIP
CIP_Cost_Reimbursable_WIP
CIP_Cost_Shared_1
CIP_Cost_Shared_2
CIP_Cost_Shared_3
CIP_Cost_Shared_4
CIP_Cost_Shared_5
CIP_Design_Bid_Build
CIP_Design_Fund_Authorization
CIP_Federal_Property_Improvement_Title
CIP_Final_Acceptance_Additional_Cost
CIP_Financial_Reporting_Organization_Code_Derivation
CIP_Improvements
CIP_In_House_Minor_Construction_1
CIP_In_House_Minor_Construction_2
CIP_Information
CIP_Interim_Acceptance_1
CIP_Interim_Acceptance_2
CIP_Phase_Indicator
CIP_Phase_Indicator_Derivation
CIP_Placed_In_Service
CIP_Preliminary_Planning_Cost
CIP_Project_Cancellation_1
CIP_Project_Cancellation_2
CIP_Project_Deferral
CIP_RPUID_2
CIP_RPUID_3
CIP_RPUID_4
CIP_Reporting_3
CIP_Sponsoring_Entity_1
CIP_Sponsoring_Entity_2
CIP_Supplier_Detail
CIP_WIP_Creation
CIP_Work_Performance
Cancellation_Effective_Date
Cancellation_Effective_Date_Derivation
Capital_Fund_Report
Capital_Improvement_Current_Period_Depreciation_Amount_Derivation
Capital_Improvement_Estimated_Useful_Life_Year_Quantity
Capital_Improvement_Financial_Reporting_Organization_Code
Capital_Improvement_Financial_Reporting_Organization_Code_Derivation
Capital_Improvement_Follow
Capital_Improvement_Placed_in_Service_Date
Capital_Improvement_Placed_in_Service_Date_Derivation
Capital_Improvement_Placed_in_Service_Date_from_SOR
Capital_Improvement_Reason_Code
Capital_Improvement_Reason_Code_Derivation
Capital_Improvement_Recorded_Cost_Derivation
City_Code
City_Code_Derivation
City_Code_from_SOR
Close_Date_No_Use
Code_Pricing_Guide
Command_Code_Establish
Command_Code_Follow_Rule
Command_Code_Maintain_Service
Commitment_Disposal_Act
Conditions_For_Unique_Identifier
Conduct_Market_Research
Congressional_District_Code
Congressional_District_Code_Derivation
Congressional_District_Code_RPIM
Construction_Material_ Code
Construction_Material_ Code_Derivation
Construction_Material_Code_from_SOR
Construction_Type_Code
Construction_Type_Code_Derivation
Construction_Type_Code_from_SOR
Conversion_Factor_Role_and_Conversion_Factor
Cooling_Degree_Days_and_Country_Code_Postal_Code
Cooling_Degree_Days_and_Start_End
Cost_Sharing_Partners_Derivation
Country_Code
Country_Code_Derivation
Country_Code_Process
Country_Code_and_RPUID
County_Code_Apply_Assets
County_Code_Entry
County_Code_Processing_Standards
Current_Working_Estimate_Date
Current_Working_Estimate_Date_Derivation
Current_Working_Estimate_Derivation
Date_and_Date_Type
Date_and_Peak_Demand_or_Date_or_Energy_Type_and_UoM_Value_Quant_and_UoM_Cat_Code
Date_in_XML
Derive_Physical_Quality_Code
Design_Authorization_Date
Design_Authorization_Date_Derivation
Design_Stop_Date
Design_Stop_Date_Derivation
Develop_Requirements_Documents
Disposal_Actual_Cost_Amount
Disposal_Actual_Cost_Amount_Derivation
Disposal_Actual_Proceed_Amount
Disposal_Actual_Proceed_Amount_Derivation
Disposal_Approval_Date
Disposal_Approval_Date_Derivation
Disposal_Business_Rule
Disposal_Completion_Date
Disposal_Completion_Date_Derivation
Disposal_Disaster
Disposal_Estimated_Net_Realizable_Value_Amount
Disposal_Estimated_Net_Realizable_Value_Amount_Derivation
Disposal_Estimated_Total_Cost
Disposal_Estimated_Total_Cost_Amount
Disposal_Estimated_Total_Cost_Amount_Derivation
Disposal_Fund_Program_Code
Disposal_Fund_Program_Code_Derivation
Disposal_Method_Code
Disposal_Method_Code_Derivation
Disposal_Net_Realizable_Value
Disposal_Program_Organization_Code
Disposal_Program_Organization_Code_RPIM
Disposal_Programmed_Fiscal_Year_Date
Disposal_Programmed_Fiscal_Year_Date_Derivation
Disposal_Reason_Code
Disposal_Reason_Code_Derivation
Disposal_Recipient_Code
Disposal_Recipient_Code_Derivation
Disposal_Recipient_Name
Disposal_Recipient_Name_Derivation
Disposal_Screening_Procedures
Disposal_Start_Date
Disposal_Start_Date_Derivation
Disposal_Status_Code
Disposal_Status_Code_Derivation
Disposal_Total_Proceed_2
Disposal_Transfer_Sale
Disposal_Value
Disposal_Value_Derivation
Disposition_Hazardous_Executed
Document_Calendar_Date
Document_Calendar_Date_Derivation
Document_Category_Code
Document_Category_Code_Derivation
Document_Description_Text_Derivation
Document_Identifier
Document_Identifier_Derivation
Document_Name
Document_Name_Derivation
Document_Routing_Code
Document_Routing_Code_Derivation
Dollar_Amount_Type_from_project_SOR
ECM_Acquisition_Mechanism
ECM_Estimated_Life_and_ECM_Identifier
ECM_Fund_Code_Mechanism
ECM_Fund_Code_and_ECM_Identifier
ECM_Identifier_and_ECM_Category
ECM_Identifier_and_ECM_Status_Code
ECM_Identifier_and_Project_Number
ECM_Identifier_and_Technology_Type
EDI_Phased_Implementation
EDI_Standards
EPA_Region_Code
EPA_Region_Code_Derivation
Efficiency_Standard_Achievement_Value_and_Efficiency_Standard_Target
Efficiency_Standard_Achievement_Value_and_RPUID
Efficiency_Standard_Target_and_RPUID
Efficiency_Standard_Target_definition
Energy_Certification_and_Person_First_Last_Name
Energy_Cost_or_Dollar_Amt_or_Value_Accuracy_Type_and_Dollar_or_Energy_Cost_Amt
Energy_Performance_Type_and_System_Type
Energy_Performance_Value_and_Energy_Performance_Type_Code
Energy_Project_Grid_Independence_Indicator_and_Project_Type_Code
Energy_Reimbursement_Percentage_and_Energy_Type
Energy_Reporting_Category_Reason_and_Energy_Reporting_Category
Energy_Role_and_Energy_Type
Energy_Training_Credit_Hours_and_Person_Role_Code
Energy_Training_Date_definition
Energy_Type_and_Energy_Role
Engineer_Useful_Life
Environmental_Liability_Ceases
Environmental_Liability_Continue
Environmental_Liability_Intended
Environmental_Liability_Ongoing
Environmental_Liability_Recovered
Environmental_Liability_Report
Environmental_Liability_Report_1
Environmental_Liability_Revise
Environmental_Liability_Service
Environmental_Measurable
Environmental_Probable
Environmental_Restoration
Environmental_Restoration_Program
Environmental_Sites_Reconcile
Establish_Competitive_Range
Estimated_Useful_Life
Excess_Declaration_Date
Excess_Declaration_Date_Derivation
Expansion_Or_Contraction
Facility_Americans_With_Disabilities_Act_Compliance_Code
Facility_Americans_With_Disabilities_Act_Compliance_Code_Derivation
Facility_Analysis_Category_Usage_Life
Facility_Book_Value_Amount
Facility_Book_Value_Amount_Derviation
Facility_Built_Date
Facility_Built_Date_Application
Facility_Built_Date_Constructed
Facility_Built_Date_Derivation
Facility_Built_Date_Multiple_Phases
Facility_Built_Date_Represent
Facility_Built_Date_from_SOR
Facility_Code_Assigned
Facility_Current_Period_Depreciation_Amount
Facility_Current_Period_Depreciation_Amount_Derivation
Facility_Estimated_Useful_Life_Adjustment_Quantity
Facility_Estimated_Useful_Life_Adjustment_Quantity_Derivation
Facility_Estimated_Useful_Life_Quantity
Facility_Estimated_Useful_Life_Quantity_Derivation
Facility_Height_Quantity
Facility_Height_Quantity_Derivation
Facility_Height_Unit_Of_Measure_Code
Facility_Height_Unit_Of_Measure_Code_Derivation
Facility_Housing_Attribute_Code
Facility_Length_Quantity
Facility_Length_Quantity_Derivation
Facility_Length_Unit_Of_Measure_Code
Facility_Length_Unit_Of_Measure_Code_Derivation
Facility_Life_Determination
Facility_Module_Quantity
Facility_Module_Quantity_Derivation
Facility_Number
Facility_Number_Derivation
Facility_Number_Plan
Facility_Number_from_SOR
Facility_Physical_Quality_Rate
Facility_Physical_Quality_Rate_Derivation
Facility_Physical_Quality_Rate_from_SOR
Facility_Plant_Replacement_Value
Facility_Plant_Replacement_Value_Amount
Facility_Plant_Replacement_Value_Amount_Derivation
Facility_Quality_Code
Facility_Replacement_Program_Fund_Code
Facility_Replacement_Program_Fund_Code_Derivation
Facility_Replacement_Program_Organization_Code
Facility_Replacement_Program_Organization_Code_Derivation
Facility_Restoration_And_Modernization_Program_Fund_Code
Facility_Restoration_And_Modernization_Program_Fund_Code_Derivation
Facility_Total_Accumulated_Depreciation_Amount
Facility_Total_Accumulated_Depreciation_Amount_Derivation
Facility_Total_Capital_Improvement_Cost_Amount
Facility_Total_Capital_Improvement_Cost_Amount_Derivation
Facility_Width_Quantity
Facility_Width_Quantity_Derivation
Facility_Width_Unit_Of_Measure_Code
Facility_Width_Unit_Of_Measure_Code_Derivation
Floor_Above_Ground_Quantity
Floor_Above_Ground_Quantity_Derivation
Floor_Below_Ground_Quantity
Floor_Below_Ground_Quantity_Derivation
Fund_Authorization_Amount_Derivation
Fund_Authorization_Type_Derivation
Fund_Type_Record
Funding_Individual _Orders
Funds_Availiability _Verified_1
Funds_Availiability _Verified_2
GSA_Region_Code
GSA_Region_Code_Derivation
Gap_Lease
Government_Purchase_Card_Threshold_1
Government_Purchase_Card_Threshold_2
Government_Purchase_Card_Threshold_3
Government_Purchase_Card_Threshold_4
Grant_Actual_Termination_Date
Grant_Actual_Termination_Date_Derivation
Grant_Annual_Cost_Amount
Grant_Annual_Cost_Amount_Derivation
Grant_Annual_Cost_Contract
Grant_Authority_Type_Code
Grant_Base_Annual_Dollar_Amount
Grant_Base_Annual_Dollar_Amount_Derivation
Grant_Cancellation_Notification_Period_Quantity
Grant_Cancellation_Notification_Period_Quantity_Derivation
Grant_Capital_Lease_Criteria_Code
Grant_Capital_Lease_Criteria_Code_Derivation
Grant_Cost_Record
Grant_End_Date
Grant_End_Date_Derivaion
Grant_Maintenance_Indicator
Grant_Parking_Indicator
Grant_Parking_Indicator_Derivation
Grant_Program_Fund_Code
Grant_Program_Fund_Code_Derivation
Grant_Start_Date
Grant_Start_Date_Derivation
Grant_Status_Code
Grant_Status_Code_Derivation
Grant_Tenant_Improvement_Allowance_Indicator
Grant_Tenant_Improvement_Allowance_Indicator_Derivation
Grant_Term_Period_Quantity
Grant_Term_Period_Quantity_Derivation
Grantee_Organization_Code
Grantee_Organization_Code_Derivation
Grantor_Organization_Code
Grantor_Organization_Code_Derivation
Hazardous_Product_Lifecycle
Hazardous_Products_Authorization
Heating_Degree_Days_and_Country_Code_Postal_Code
Heating_Degree_Days_and_Start_End_Date
Height_Quantity_Record
Historic_Status_Code
Identification_Of_Discrepancies
Inspection_Description_Text
Inspection_Description_Text_Derivation
Inspection_Finding_Category_Name
Inspection_Finding_Category_Name_Derivation
Inspection_Finding_Date
Inspection_Finding_Date_Derivation
Inspection_Finding_Description_Text
Inspection_Finding_Description_Text_Derivation
Inspection_Identifier
Inspection_Identifier_Derivation
Inspection_Item_Description_Text
Inspection_Item_Description_Text_Derivation
Inspection_Item_Identifier
Inspection_Item_Identifier_Derivation
Inspection_Item_Inspection_Start_Date
Inspection_Item_Inspection_Start_Date_Derivation
Inspection_Item_Inspection_Stop_Date
Inspection_Item_Inspection_Stop_Date_Derivation
Inspection_Item_Person_Role_Code
Inspection_Item_Person_Role_Code_Derivation
Inspection_Type_Code
Inspection_Type_Code_Derivation
Installation_Close_Date
Installation_Close_Date_Applicable
Installation_Close_Date_Derivation
Installation_Code
Installation_Code_Derivation
Installation_Code_from_SOR
Installation_Creation_Date
Installation_Creation_Date_Derivation
Installation_Name
Installation_Name_Derivation
Installation_Name_Elements
Installation_Name_from_SOR
Installation_Operational_Status_Code
Installation_Operational_Status_Code_Derivation
Installation_Operational_Status_Code_from_SOR
Installation_Reporting_Component_Code
Installation_Reporting_Component_Code_Derivation
Installation_Reporting_Component_Code_from_SOR
Installation_Virtual_Indicator
Installation_Virtual_Indicator_Derivation
Instrument_Amendment_Number
Instrument_Amendment_Number_Derivation
Instrument_Number
Instrument_Number_Derivation
Instrument_Type_Code
Insturment Type Code_Derivation
Inventory_Asset_Record
Issuance_Hazardous_Executed
Land_Acquisition_Tract_Identifier
Land_Asset_Cost
Land_Interest_Codes
Land_Parcel_Code
Land_Predominant_Use_Code
Lat_Long_Coordinant_Length
Lease_Management_System
Leased_Site_Indicator
Leased_Site_Indicator_Derivation
Length_Quantity_Record
Liability_Transaction
Life_Capital_Improvement
Life_Quantity_Documentation
Lifecycle_Cost_Avoidance_Type_and_ECM_Identifier
Linear_Structure_Module_Above_Or_Below_Surface_Code
Linear_Structure_Module_Above_Or_Below_Surface_Code_Derivation
Linear_Structure_Module_Hazardous_Material_Capability_Code
Linear_Structure_Module_Hazardous_Material_Capability_Code_Derivation
Linear_Structure_Module_SEG_X_Module_Number
Linear_Structure_Module_SEG_X_Module_Number_Derivation
Location_Directions_Text
Location_Directions_Text_derivation
Location_Directions_Text_from_SOR
M&V_Method_and_Project_Number
Material_Safety_Data_Sheet_Determine
Meter_Identifier_and_RPUID_Meter_Type
Meter_Location_Description_and_Meter_Identifier
Meter_Location_and_Meter_Identifier
Meter_Type_and_Energy_Type
Metro_Statistical_Area_Code
Metro_Statistical_Area_Code_Derivation
Metro_Statistical_Area_Code_RPIM
Mission_Dependency_Index_and_RPUID_RPSUID
Modifications_To_Awards
Obtain_Build_Date
Obtain_Disposal_Completion_Date
Obtain_Or_Match_Code
Occupy_Real_Property
One_Built_Date
One_Phenomenon_Per_Geospatial_Feature
Order_Quantity_1
Order_Quantity_2
Payback_Period_and_ECM_Identifier
Peak_Demand_Type_definition
Person_Contact_Information_and_Person_Identifier
Person_Name_Family_Name_Derivation
Physical_Accountability_End
Place_Of_Acceptance
Planned_Programmed_Event_Code_Derivation
Planned_Programmed_Fiscal_Year_Date_Derivation
Plant_Replacement_Value_Factor
Populate_Region_Code
Postal_Code
Postal_Code_Derivation
Postal_Code_from_SOR
Programmed_Amount_Derivation
Proj_Number_and_Date_and_Proj_Status_or_Proj_Type_Code_and_Date_or_Techn_Type
Project_Approval_Date
Project_Approval_Date_Derivation
Project_Completion_Date
Project_Completion_Date_Derivation
Project_Description_Interface
Project_Description_Text
Project_Description_Text_Derivation
Project_Detail_Fund_Code
Project_Detail_Fund_Code_Cost_Amount
Project_Detail_Fund_Code_Cost_Amount_Derivation
Project_Detail_Fund_Code_Derivation
Project_Detail_Organization_Code
Project_Detail_Organization_Code_Derivation
Project_Number
Project_Number_Derivation
Project_Status_Code_and_Date_Date_Type
Project_Total_Cost_Amount
Project_Total_Cost_Amount_Derivation
Project_Type_Code
Project_Type_Code_Derivation
Property_Action_Person_Role_Code
Property_Asset_Legal
Property_Inspection_Reason_Code
Property_Inspection_Reason_Code_Derivation
Public_Law_Date
Public_Law_Date_Derivation
RE_and_Ownership_Type
RPA_Annual_Operating_Cost_Amount
RPA_Annual_Operating_Cost_Amount_Derivation
RPA_Command_Claimant_Code
RPA_Command_Claimant_Code_Derivation
RPA_Command_Claimant_Code_from_SOR
RPA_Current_Use_Functional_Capability_Code
RPA_Current_Use_Functional_Capability_Code_Derivation
RPA_Depth_Unit_Of_Measurement_Code_Derivation
RPA_Description_Text
RPA_Description_Text_Derivation
RPA_Financial_Reporting_Organization_Code
RPA_Financial_Reporting_Organization_Code_Derivation
RPA_Historic_Status_Code
RPA_Historic_Status_Code_Derivation
RPA_Historic_Status_Date
RPA_Historic_Status_Date_Derivation
RPA_Interest_Type_Code
RPA_Interest_Type_Code_Derivation
RPA_Interest_Type_Code_from_SOR
RPA_Mission_Dependency_Code
RPA_Mission_Dependency_Code_Derivation
RPA_Name
RPA_Name_Derivation
RPA_Name_from_SOR
RPA_Neighborhood_Name
RPA_Neighborhood_Name_Derivation
RPA_Operational_Status_Code
RPA_Operational_Status_Code_Derivation
RPA_Operational_Status_Code_from_SOR
RPA_Placed_In_Service_Date
RPA_Placed_In_Service_Date_Derivation
RPA_Placed_in_Service_Date_from_SOR
RPA_Predominant_Current_Use_CATCODE_Code
RPA_Predominant_Current_Use_CATCODE_Code_Derivation
RPA_Predominant_Current_Use_FAC_Code
RPA_Predominant_Current_Use_FAC_Code_Derivation
RPA_Predominant_Current_Use_FAC_Code_from_SOR
RPA_Predominant_Design_Use_CATCODE_Code_Derivation
RPA_Predominant_Design_Use_FAC_Code
RPA_Predominant_Design_Use_FAC_Code_Derivation
RPA_Preponderant_Using_Organization_Code
RPA_Preponderant_Using_Organization_Code_Derivation
RPA_Salvage_Value_Amount
RPA_Salvage_Value_Amount_Derivation
RPA_Salvage_Value_Reason_Code
RPA_Sustainability_Code
RPA_Sustainability_Code_Derivation
RPA_Total_Unit_Of_Measure_Code
RPA_Total_Unit_Of_Measure_Code_Derivation
RPA_Total_Unit_Of_Measure_Quantity
RPA_Total_Unit_Of_Measure_Quantity_Derivation
RPA_Total_Unit_of_Measure_Code_from_SOR
RPA_Total_Unit_of_Measure_Quantity_from_SOR
RPA_Type_Code
RPA_Type_Code_Derivation
RPA_Type_Code_from_SOR
RPA_Utilization_Rate
RPA_Utilization_Rate_Derivation
RPSUID_from_SOR
RPUID_and_Energy_Reporting_Category_definition
RPUID_and_Energy_Reporting_Organization_Code
RPUID_from_SOR
R_E_Potential_Amount_and_R_E_Analysis_Category_and_R_E_Analysis_Category_Rating
Real_Property_Asset_Record
Real_Property_Asset_Restriction
Real_Property_Asset_Usage
Real_Property_Duplication
Real_Property_Facility_Life
Real_Property_Inventory
Real_Property_Network_Identifier
Real_Property_Network_Identifier_Derivation
Real_Property_Network_Name_Derivation
Real_Property_Network_Supplier_Name
Real_Property_Network_Supplier_Name_Derivation
Real_Property_Network_Supplier_Type_Code
Real_Property_Network_Supplier_Type_Code_Derivation
Real_Property_Network_Type
Real_Property_Network_Type_Derivation
Real_Property_Site_Unique_Identifier
Real_Property_Site_Unique_Identifier_Derivation
Real_Property_Unique_Identifier
Reason_For_Cancellation_Derivation
Receipt_Hazardous_Approved
Receiving_Document_Generated
Recognize_PPE_Book_Value
Record_Parcel_Attributes
Record_Site_Creation_Date
Reimbursable_Agreement_Support_Code
Remove_Net_Book_Value
Remove_Property_Asset
Renewable_Energy_Analysis_Category_Rating_and_RPSUID
Renewable_Energy_Analysis_Category_Rating_and_Renewable_Energy_Analysis_Category
Renewable_Energy_Analysis_Category_and_RPUID
Renewable_Energy_Analysys_Category_and_RPUID
Renewable_Energy_Classification_definition_of_new
Renewable_Energy_Classification_definition_of_old
Renewable_Energy_Potential_Amount_and_RPSUID
Report_Region_Code
Reporting_Organization_Code
Requirements_Approval
Requirements_Identification
Restriction_Description_Text
Restriction_Description_Text_Derivation
Restriction_End_Date
Restriction_End_Date_Derivation
Restriction_Start_Date
Restriction_Start_Date_Derivation
Restriction_Status
Restriction_Type_Code
Restriction_Type_Code_Derivation
Retain_Property_Record
Return_Of _Unacceptable_Items
Route_Approved_Requirement
Salvage_Value
Select_Award_Type
Single_Occupancy_Agreement
Site_Close_Date
Site_Close_Date_Derivation
Site_Closed_Date
Site_Code_Derivation
Site_Command_Claimant_Code
Site_Command_Claimant_Code_Derivation
Site_Creation_Date
Site_Creation_Date_Derivation
Site_Delivered_Source_Energy_definition
Site_Land_Total_Area_Quantity
Site_Land_Total_Area_Quantity_Derivation
Site_Land_Total_Area_Unit_Of_Measure_Code
Site_Land_Total_Area_Unit_Of_Measure_Code_Derivation
Site_Latitude_Coordinate
Site_Latitude_Coordinate_Derivation
Site_Longitude_Coordinate
Site_Longitude_Coordinate_Derivation
Site_Name
Site_Name_Derivation
Site_Name_from_SOR
Site_Operational_Status_Code
Site_Operational_Status_Code_Derivation
Site_Operational_Status_from_SOR
Site_Primary_Activity_Code
Site_Primary_Activity_Code_Derivation
Site_Primary_Indication_from_SOR
Site_Primary_Indicator
Site_Primary_Indicator_Derivation
Site_Release_Date
Site_Release_Date_Derivation
Site_Reporting-Component_Code_Derivation
Site_Reporting-Component_Code_RPIM
Site_Reporting_Component_Code
Site_Rural_Urban_Code
Site_Rural_Urban_Code_Derivation
Split_Parcel_1
Split_Parcel_2
State_Or_Country_Primary_Subdivision_Code
State_Or_Country_Primary_Subdivision_Code_Derivation
State_or_Country_Primary_Subdivision_Code_from_SOR
Structure_Align_Pricing_Guide
Sub_Account_Code
Sub_Account_Code_Derivation
Supporting_Documentation_Captured
Supporting_Documentation_Organizational_Level
Supporting_Documentation_Origin_Estimate
Surplus_Determination_Date
Surplus_Determination_Date_Derivation
System_Capacity_and_System_Type
System_Manufacturer_and_System_Type
System_Type_and_Unique_Item_Identifier
Target_Asset_Owner
Target_Asset_Owner_Derivation
Technology_Type_and_ECM_Identifier
Technology_Type_and_Project_Number
Temperature_Type_and_UOM_Value_Quantity
Time_Type_and_Energy_Type_Energy_Role
Time_Type_and_RPUID
Time_and_Time_Type
Transferred_Real_Property
Transferred_Real_Property_2
UOM_Role_and_UOM_Value_Quantity
USC _Citation_Derivation
Update_CIP_Account_1
Update_CIP_Account_2
Update_CIP_Account_3
Update_CIP_Account_4
Utility_Provider_Customer_Account_Number_and_RPSUID
Utility_Provider_Customer_Account_Number_and_Utility_Provider_Organization_Name
Utility_Provider_Invoice__Number_and_Utility_Provider_Customer_Account_Number
Utility_Provider_Organization_Name_and_Energy_Type
Utility_Provider_Organization_Name_and_Utility_Provider_Type
Utility_Provider_Rate_Schedule_Code_and_Date_Date_Type
Value_Accuracy_Type_and_Energy_Cost_Type_Dollar_Amount_Type
Value_Accuracy_Type_definition
Value_Disposal_Proceed
Work_Classification_Code_Derivation
Work_Description_Text_Derivation
Work_Order_Authorization_Date
Work_Order_Authorization_Date_Derivation
Work_Order_Number_Derivation
Workload_Quantity_and_Workload_Utilization_Type_RPUID
Workload_Utilization_Type_and_Workload_Quantity

CBM - Data Objects

Count:395

Data Objects
10 USC 2805
10 USC 2853
Acceptable Discrepancies
Acceptance Evidence
Acceptance Feedback Information
Acceptance Information
Acceptance Readiness Notification
Acceptance Results
Accepted Intragovernmental Agreement
Accepted Intragovernmental Order
Accepted Purchase Request
Accepting Officials List
Accounts Payable Offset
Accounts Payable Offset Request
Accounts Payable Pro Forma Entries
Accrued Liability Pro Forma Entries
Acknowledged Intragovernmental Order
Acquisition Requirement
Additional Supporting Collection Information
Adjustment to be Made
Administrative Procurement Change Request
Advance Ship Notice Information
Advice of Payment
Aggregated Spend Information
Amortization and Interest
Analytical Results
Anticipated Adjustment
Approved Adjustment
Approved Billing Document
Approved Payment Request
Approved Request for Proposal
Approved Sourcing Plan
Approved Sourcing Plan Authorizing Micropurchase
Approved Sourcing Plan Needing New Agreement
Approved Sourcing Plan for Non Micropurchase Requirement
Approved Sourcing Plan with Existing Agreement
Archived Intragovernmental Order
Archived Procurement Instrument
Arrival Information
Assessment Budget Request
Assessment Cost Information
Assessment Results and Risk Finding
Asset Additional Information
Asset Additional Information Request
Asset Hazardous Process Description
Asset Information Initial Request
Asset Record
Asset Recorded Cost Information
Asset Valuation Information
Authorization to Receive Financing Payment
Awarded Agreement
Awarded Procurement Instrument or Supplemental Procurement Instrument
Budget Authority
Build Make Maintenance Sustainment Evidence
Business System Approval or Disapproval
Buyer Approved Intragovernmental Order
Buyer Planning Information
CIP Cost Information
Cancel Payment Notification
Cancel Payment Request
Cancel Payment Request Returned
Capital Asset Valuation Information
Categorized Requirement
Certified Business Partner Payment Information
Certified Business Partner Payment Rejection
Certified Human Resources Management Pay Information
Certified Real Property Discrepancy Report
Characterized ESOH Issue
Chemical and Regulatory Information
Closed Intragovernmental Order
Closed Procurement Instrument
Closeout Information from External Sources
Closeout Plan
Closing or Signing Schedule
Collection Confirmation
Collection Information
Collection Pro Forma Entries
Collection Voucher Control Log
Collection and Payment History
Comments to Public Draft Request for Proposal
Commissioning Requirements List
Commitment
Commitment Modification Request
Commitment Request
Communication from Government Supplier
Communication from Supplier
Communication to Government Supplier
Communication to Supplier
Compliance Determination
Confirmation of Physically Complete Procurement Instrument or IGT Order
Confirmation of Reimbursable Authority
Confirmed Collection
Confirmed Contract Fulfillment
Confirmed Payment
Consolidated Real Property Discrepancy List
Construction Requirement
Contract Action Report
Contract Holdback Account
Contract Holdback Account Information
Contract Modification
Contract Specification
Contractor Receipt of Government Furnished Property
Cooperative Agreement
Coordinated Agreement
Coordination Request
Correcting Pro Forma Entries
Corrective Action Plan
Cost Allocation Guidance
Cost Information
Cost Model Template
Cost Model Template Request
Covered Facility Designation Information
Current Working Estimate Report
Customer and Vendor Information
Debt Compromise
Demand Information
Department of Defense Fund Balance
Deployed ESOH Solution
Disapproved Payment Requests
Disbursement Confirmation
Disbursement Log
Disbursement Pro Forma Entries
Disbursing Information
Discrepancy Dispute Resolution
Discrepancy Report Information
Disposal Evidence
Disposal Hazardous Process Description
Disposition Information
Disposition of Loss
Draft Agreement
Draft Contract
Draft Contract or Order Information
Draft Contract or Order Modification
ESOH Assessment Service Request
ESOH Control Requirement
ESOH Issue Communication
ESOH Issue Description
ESOH Issue Profile
ESOH Solution Development Request
ESOH Solution Scope Change Information
ESOH Solution Service Request
Earned Interest Revenue
Earned Value Management Information
Energy Analytics for Reporting
Energy Conservation Goal Information
Energy Conservation Measure Approval Document
Energy Conservation Measure Approval Request
Energy Conservation Measure Potential Mission Impact Information
Energy Conservation Measure Potential Mission Impact Information Request
Energy Conservation Measure Selection Criteria
Energy Conservation Reporting Requirements
Energy Goal Performance Information
Energy Project Acceptance Information
Energy Project Contract Information
Energy Project Execution Information
Energy Project Measurement & Verification Criteria
Energy Project Performance Information
Energy Project Schedule Information
Energy Reporting Information for Analysis
Environmental Liability Cost Estimate Information
Environmental Liability Footnote Information
Environmental Liability Information Rejected
Environmental Liability Site or Item Information
Environmental Liability Transaction Information
Estimates of Corrective Actions
Evidence of Goods Tendered
Evidence of Goods Tendered and Services Rendered
Evidence of Goods Tendered and Services Rendered from External
Excess Real Property Declaration
Executive Order 13327
External Carrier Information
External Energy Goal Information
External Energy Reporting Information
External Energy Reporting Requirements
External Shipping Information
Facility Efficiency Achievement Information
Facility Efficiency Goal Information
Facility Efficiency Information
Facility Energy Analytics for Decision Making
Facility Energy Consumption Analysis Results
Facility Energy Consumption Goal Achievement Information
Facility Energy Consumption Goal Information
Facility Energy Consumption Goal Performance Information
Facility Energy Consumption Information
Facility Energy Consumption Parameters
Facility Energy Consumption Reporting Information
Facility Energy Consumption Reporting Requirements
Facility Energy Goal Information
Facility Energy Goal Performance Information
Facility Energy Reporting Category Determination
Facility Energy Reporting Category Information
Facility Energy Reporting Information
Facility Energy Reporting Requirements
Facility Energy Review Information Request
Facility Energy Review Results
Facility Operations Information
Facility Review Efficiency Information
Facility Review Operations Information
Federal Performance Information
Final Intragovernmental Order Costs
Final Procurement Instrument Costs
Financial Management Policy Request
Financial Transaction Report
Footnote Information
Forecasted Requirements
Form and Content Guidance
Funds Availability Request
Gain or Loss on Sale of Investment
Goods and Services Acknowledgement
Government Furnished Materiel Request
Government Solicitation
Government Solicitation Response
Government Source Selection Documentation
Government Supplier Response
Hazardous Process Description from Warfighter
Housing Entitlement Notification
Human Resources Profile Information
Identification Budget Request
Implement Solution Budget Request
Implementation Cost Information
Incomplete Delivery
Individual Travel Authorization
Inspected Goods and Services Evidence with Discrepancies
Inspected Goods and Services Evidence with no Discrepancies
Inspection Report
Inspection Report for Goods and Services
Inspection and Verification Participants
Inspection and Verification Schedule
Installation Support Hazardous Process Description
Integrated Plan and Roadmap
Interim Title Opinion
Intragovernmental Order Closure Authorization
Intragovernmental Order Closure Information
Intragovernmental Order Closure Notice
Investment Asset Record
Investment Payment Request
Logistics Order
Logistics Order Modification
Market Information
Materiel and Forces Status Information
Materiel or Service Requirement
Military Interdepartmental Purchase Request
Mission OPTEMPO Information
Mission OPTEMPO Information Request
Modeling Services Procurement Request
Modification or Change Notification
Modification or Change Requirement
New Cost Model
New Data Element Request
Notification of Collection
Notification of Disbursement
Notification of Final Delivery
Notification of Funds Availability
Notification of Loss from Supplier
Notification of Payment Cancellation
Notification of Rejected Collection
Obligation Request
Offset Pro Forma Entries
Other Real Property Acquisition Information
Paid Disbursement Voucher
Payment Request
Payment Request for Goods
Payment Request for Services
Performance Evidence
Performance Information
Physical Inventory Methodology and Plan
Plant Clearance Disposition
Plant Clearance Schedule
Potential Energy Conservation Measure Information
Potential Renewable Energy Project Information
Pre Solicitation Notice
Prior Business System Approval or Disapproval
Procurement Change Request
Procurement Evidence
Procurement Instrument Closure Information
Procurement Instrument Execution Information
Procurement Instrument Execution Information from External
Procurement Instrument Performance Information
Procurement Request
Product Surveillance Information
Program and Funding Document
Project Cancellation Cost
Project Cancellation Evidence
Project Cancellation Notice
Project Information
Project Not Approved
Property Information Request
Property Operation and Management Information
Proposal
Public Draft Request for Proposal
Public Law 91-646 Acknowledgement
Purchase Card Requirement
Purchase Request
Real Property Acceptance Checklist
Real Property Acceptance Evidence
Real Property Acceptance Package
Real Property Acquisition Documents
Real Property Asset Condition Update
Real Property Asset Valuation Information
Real Property Discrepancy Report
Real Property Disposal Requirement
Real Property Graphic Information
Real Property Installed Equipment Recovered Notification
Real Property Operation Ceased Notification
Real Property Outgrant Evidence
Real Property Placed in Service Notification
Receivable Pro Forma Entries
Recovered Property Information
Refined Requirement
Regulatory Requirements Documents
Rejected Intragovernmental Order
Rejected Payment Request
Rejected Purchase Request
Rejection of Goods or Services Notification
Remittance Information
Renewable Energy Goal Information
Renewable Energy Potential Mission Impact Information
Renewable Energy Potential Mission Impact Information Request
Renewable Energy Production Information
Renewable Energy Project Acceptance Information
Renewable Energy Project Approval Document
Renewable Energy Project Approval Request
Renewable Energy Project Contract Information
Renewable Energy Project Execution Information
Renewable Energy Project Measurement and Verification Criteria
Renewable Energy Project Performance Information
Renewable Energy Project Schedule Information
Renewable Energy Project Selection Criteria
Renewable Energy Purchase Amount Information
Renewable Energy Purchase Requirement Information
Renewable Energy Reporting Requirements
Renewable Energy Site Assessment Information
Renewable Energy Site Assessment Information Request
Renewable Energy Site Assessment Results
Replenishment Stock Request
Request for Additional Supporting Collection Information
Request for Administrative Offset
Request for Disposition
Request for Increased Reimbursable Authority
Request for Proposal
Request for Refund
Request for Supplier Inventory Availability
Required Inspections and Verifications
Requirement Change from Sourcing
Research Information
Research Information External
Responsive Proposal
Return or Disposal Authorization
Return or Disposal Authorization Request
Returned Payment Notice
Returned Payment for Re-Disbursement
Returned Payment for Rescheduling
Revenue Data
Sales Reimbursement Information
Scheduled Disposal Information
Scheduled Payment
Scheduled Payment for Disbursement
Selected ESOH Solution
Selected Energy Conservation Measure Information
Service Procurement Request
Signed Intragovernmental Agreement
Solicitation Quote
Solution Development Cost Information
Source Selection Documentation
Sourcing Planning Information Request
Sourcing Planning Information Response
Spend Information
Spend Reports
Stakeholder Input
Stop Payment Notification
Subcontracting Report
Summarized Balance of Accounts for Procurement
Supplier Coordination Information
Supplier Information
Supplier Inventory Information
Supplier Planning Information
Supplier Product Hazard Information
Supplier Response
Supply Request
Technical Surveillance for Service Information
Time and Materiel Surveillance Information
Training Certifications
Transfer of Government Property
Unapproved Draft Request for Proposal
Updated Materiel Asset Information
Updated Real Property Asset Information
Valuation Template
Valuation Template Request
WIP Cost Information
Withhold or Holdback Payment
Work Order
Work Order Requirement
Work Request
Workforce Occupational Safety Issue Communication
Workforce Occupational Safety Issue Information

CBM - Entities

Count:455

Entities
ACCEPTANCE
ACCOUNTING-CLASSIFICATION-STRUCTURE
ACCOUNTING-TRANSACTION
ACGIH-EXPOSURE-LIMIT-INFORMATION
ACQUISITION-ELEMENT
ACQUISITION-ELEMENT-PRICE-COMPONENT
ACQUISITION-ELEMENT-TYPE
ACQUISITION-ELEMENT-TYPE-PRICE-COMPONENT-TYPE
AD-HOC-COMPOUND-COORDINATE-REFERENCE-SYSTEM-GEOSPATIAL-FEATURE
ADMINISTRATIVE-CONTROL
ASSET
ASSET-TRANSACTION
ASSIGNED-SPACE-CURRENT-USE
ASSIGNED-SPACE-UTILIZATION
BID
BUDGET-LINE-ITEM
BUILDING
BUILDING-MODULE
CAPITAL-IMPROVEMENT
CARCINOGEN-INFORMATION
CERTIFICATION
CERTIFICATION-TYPE
CHEMICAL-ABSTRACT-SERVICE-REGISTRY-NUMBER
CHEMICAL-EXPOSURE-SYMPTOMS
CHEMICAL-FAMILY-NAME
CITY
CLEAN-AIR-ACT-REGULATORY-THRESHOLD
CLIMATE-ZONE-INFORMATION
COMPREHENSIVE-ENVIRONMENTAL-RESPONSE-COMPENSATION-LIABILITY-ACT-REG-THRESHOLD
CONSUMABLE
CONTAINERIZED-PHD-PRODUCT
CONTRACT
CONTRACT-EXECUTION-EVENT
CONTRACT-EXECUTION-EVENT-LINE-ITEM
CONTRACT-EXECUTION-EVENT-LINE-ITEM-LOCATION
CONTRACT-EXECUTION-EVENT-LINE-ITEM-ORGANIZATION
CONTRACT-EXECUTION-EVENT-LINE-ITEM-PERSON-ORGANIZATION
CONTRACT-EXECUTION-EVENT-ORGANIZATION
CONTRACT-EXECUTION-EVENT-PERSON-ORGANIZATION
CONTRACT-LINE-EVENT-ACCEPTANCE
CONTRACT-LINE-EVENT-CREDIT-MEMORANDUM
CONTRACT-LINE-EVENT-INSPECTION
CONTRACT-LINE-EVENT-RECEIPT
CONTRACT-LINE-ITEM
CONTRACT-LINE-ITEM-ACQUISITION-ELEMENT
CONTRACT-LINE-ITEM-ASSOCIATION
CONTRACT-LINE-ITEM-MATCH-RULE
CONTROL
CONTROL-GUIDANCE
CORE-BASED-STATISTICAL-AREA
COST-ESTIMATE
COST-ESTIMATE-DOCUMENT
COST-ESTIMATE-METHOD
COST-ESTIMATE-PERSON
COST-ESTIMATE-REVISION
COUNTRY
COUNTRY-PRIMARY-DIVISION
COUNTRY-SUBDIVISION
COVERAGE-GEOSPATIAL-FEATURE
DEMAND
DEMAND-LINE-ITEM
DEMAND-LINE-ITEM-ACQUISITION-ELEMENT
DEMAND-LINE-ITEM-PERSON
DEMAND-PERSON
DEMAND-REQUIREMENT
DEMAND-US-FEDERAL-GOVERNMENT-DOD-ORGANIZATION
DENSITY-INFORMATION
DEPRECIATION-METHOD
DEPRECIATION-PLAN
DEPRECIATION-PLAN-EXECUTION
DIMENSION
DIMENSION-ASSOCIATION
DIMENSION-TYPE
DIMENSION-TYPE-UOM
DOCUMENT
DOCUMENT-ASSOCIATION
DOCUMENT-FORMAT
DOCUMENT-FORMAT-PHYSICAL-MEDIA-TYPE
DOCUMENT-MEDIA
DOCUMENT-MEDIA-LOCATION
DOCUMENT-ORGANIZATION
DOCUMENT-PERSON
DOCUMENT-ROUTING
ELECTRONIC-ADDRESS
ELECTRONIC-MAIL-ADDRESS
EMERGENCY-PLANNING-AND-COMMUNITY-RIGHT-TO-KNOW-ACT-REGULATORY-THRESHOLD
ENERGY-CONVERSION-INFORMATION
ENERGY-COST-INFORMATION
ENERGY-DOLLAR-AMOUNT-INFORMATION
ENERGY-MEASUREMENT-INFORMATION
ENERGY-PEAK-DEMAND-TYPE
ENERGY-PERFORMANCE-INFORMATION
ENERGY-PROJECT
ENERGY-PROJECT-STATUS-INFORMATION
ENERGY-SECURITY-INFORMATION
ENERGY-TECHNOLOGY-TYPE
ENERGY-TEMPERATURE-TYPE
ENERGY-TYPE
ENGINEERING-CONTROL
ENVIRONMENT-INTEREST-AREA
ENVIRONMENTAL-COMPLIANCE-AGREEMENT
ENVIRONMENTAL-COMPLIANCE-AGREEMENT-ITEM
ENVIRONMENTAL-COMPLIANCE-EVALUATION
ENVIRONMENTAL-COMPLIANCE-FINDING
ENVIRONMENTAL-COMPLIANCE-FINDING-GUIDANCE
ENVIRONMENTAL-COMPLIANCE-NOTIFICATION
ENVIRONMENTAL-COMPLIANCE-NOTIFICATION-COMPLIANCE-FINDING
ENVIRONMENTAL-COMPLIANCE-TASK
ENVIRONMENTAL-LIABILITY
ENVIRONMENTAL-LIABILITY-BUSINESS-SEGMENT
ENVIRONMENTAL-LIABILITY-LEGAL-DRIVER
EPA-REGION
EPCRA-HAZARD-INFORMATION
EQUIPMENT
ESOH-ASPECT
ESOH-INTEREST-AREA
ESOH-INTEREST-AREA-PROPERTY
ESOH-INTEREST-AREA-SOLUTION
ESOH-INTEREST-AREA-SOLUTION-DOCUMENT
ESOH-INTEREST-AREA-STATUS
EVAPORATION-INFORMATION
EVIDENCE-GOODS-TENDERED-AND-SERVICES-RENDERED
EVIDENCE-GOODS-TENDERED-AND-SERVICES-RENDERED-PERSON
EVIDENCE-GOODS-TENDERED-AND-SERVICES-RENDERED-SHIPMENT-UNIT
EVIDENCE-GOODS-TENDERED-AND-SERVICES-RENDERED-SUPPLIER
EXPLOSIVE-REGULATORY-THRESHOLD
EXTREMELY-HAZARDOUS-SUBSTANCE-REGULATORY-THRESHOLD
FACILITY-ANALYSIS
FACILITY-ANALYSIS-UOM
FACILITY-CONSTRUCTION
FACILITY-ENERGY-INFORMATION
FACILITY-UTILITY-METER-INFORMATION
FEDERAL-SUPPLY-CLASSIFICATION-CLASS
FEDERAL-SUPPLY-CLASSIFICATION-GROUP
FINANCING-ELEMENT-TYPE
FUNDING-CENTER
FUNDING-CENTER-PROJECT
FYDP-PROJECT
GENERAL-EQUIPMENT
GEOPOLITICAL-AREA
GEOPOLITICAL-AREA-DIMENSION
GEOPOLITICAL-AREA-GEOSPATIAL-FEATURE
GEOSPATIAL-FEATURE
GOOD-RECEIPT
GSA-REGION
GUIDANCE
HAZARDOUS-PROCESS
HAZARDOUS-PROCESS-ASPECT
HAZARDOUS-PROCESS-AUTHORIZATION
HAZARDOUS-PROCESS-AUTHORIZATION-CONTROL
HAZARDOUS-PROCESS-AUTHORIZATION-EQUIPMENT
HAZARDOUS-PROCESS-AUTHORIZATION-MATERIAL
HAZARDOUS-PROCESS-AUTHORIZATION-PERSON
HAZARDOUS-PROCESS-AUTHORIZATION-PROPERTY-OBJECT
HAZARDOUS-PROCESS-CONTROL
HAZARDOUS-PROCESS-EXECUTION
HAZARDOUS-PROCESS-EXECUTION-FEEDBACK
HAZARDOUS-WASTE-INFORMATION
HEALTH-RISK-INFORMATION
INGREDIENT
INGREDIENT-CHEMICAL
INSPECTION
INSPECTION-ELEMENT
INSPECTION-ELEMENT-DISCREPANCY
INSPECTION-FINDING
INSPECTION-ITEM
INSPECTION-ORGANIZATION
INSPECTION-PERSON
INSPECTION-POINT-TYPE
INSTALLATION
INSTALLATION-PERSON
INSTALLATION-SITE
INSTRUCTIONAL-UNIT
INSTRUCTIONAL-UNIT-DEVELOPMENT-PLAN-ITEM
INTEREST-AREA
INTEREST-AREA-GEOSPATIAL-FEATURE
INTEREST-AREA-ORGANIZATION-RESPONSIBILITY
INTERNAL-USE-SOFTWARE
INTERNET-ADDRESS
INTRAGOVERNMENTAL-ORDER-LINE-ITEM
INVITATION-FOR-BID
INVOICE-LINE-ITEM
IONIZATION-INFORMATION
ISO-COMPOUND-COORDINATE-REFERENCE-SYSTEM
ISO-COORDINATE-REFERENCE-SYSTEM
ISO-COORDINATE-REFERENCE-SYSTEM-ALIAS
ISO-HORIZONTAL-COORDINATE-REFERENCE-SYSTEM
ISO-VERTICAL-COORDINATE-REFERENCE-SYSTEM
LAND-PARCEL
LEGAL-DRIVER
LETHAL-CONCENTRATION
LIABILITY-TRANSACTION
LINE-OF-BUSINESS
LINEAR-STRUCTURE
LINEAR-STRUCTURE-MODULE
LOCATION
LOCATION-DIMENSION
LOCATION-GEOPOLITICAL-AREA
LOCATION-GEOSPATIAL-FEATURE
LOCATION-HAZARDOUS-PROCESS-AUTHORIZATION
LOCATION-ORGANIZATION
LOCATION-PERSON
MATERIAL-SAFETY-DATA-SHEET-DOCUMENT
MATERIAL-STOCK-NUMBER-INFORMATION
MATERIEL-CATALOG-ITEM
MATERIEL-CATALOG-ITEM-COMPONENT
MATERIEL-CATALOG-ITEM-MATERIAL-PERIOD
MATERIEL-ELEMENT-TYPE
MEASUREMENT-QUALIFIER
MILITARY-EQUIPMENT
NEIGHBORHOOD
NON-ELECTRONIC-ADDRESS
NON-US-FEDERAL-ORGANIZATION-SUPPLIER
NORTH-AMERICAN-INDUSTRIAL-CLASSIFICATION-SYSTEM
OBLIGATION-TRANSACTION
OCCUPATIONAL-HEALTH-INTEREST-AREA
ODOR-INFORMATION
OFFER-RESPONSE
OFFER-RESPONSE-EVALUATION
OFFER-RESPONSE-LINE-ITEM
OFFICIAL-COMPOUND-COORDINATE-REFERENCE-SYSTEM-GEOSPATIAL-FEATURE
OMNICLASS-REAL-PROPERTY-FACILITY
ONE-DIMENSIONAL-GEOSPATIAL-FEATURE
ORGANIZATION
ORGANIZATION-ELECTRONIC-ADDRESS
ORGANIZATION-IDENTIFICATION
ORGANIZATION-IDENTIFICATION-TYPE
ORGANIZATION-NAME
ORGANIZATION-ROLE
ORIGINAL-CONSTRUCTION
OSHA-EXPOSURE-LIMIT-INFORMATION
PAYABLE
PAYROLL-DEMAND-ITEM
PERFORMANCE-EVIDENCE
PERSON
PERSON-CERTIFICATION
PERSON-CERTIFICATION-TYPE
PERSON-HEALTH-HISTORY
PERSON-INSTRUCTIONAL-UNIT
PERSON-ORGANIZATION
PERSON-SKILL
PERSONAL-PROPERTY
PERSONAL-PROTECTIVE-EQUIPMENT-CONTROL
PHD-CHEMICAL-EXPOSURE-LIMIT-INFORMATION
PHD-EXPOSURE-LIMIT-INFORMATION
PHD-MATERIAL-CHEMICAL
PHD-MATERIAL-CHEMICAL-NAME
PHD-MATERIAL-CHEMICAL-REGULATORY-THRESHOLD
PHD-MATERIAL-EXPOSURE-LIMIT-INFORMATION
PHD-PRODUCT
PHD-PRODUCT-DOCUMENT
PHD-PRODUCT-FORMULATION
PHD-PRODUCT-GRAPHICAL-SYMBOL-INFORMATION
PHD-PRODUCT-HANDLING-AND-STORAGE
PHD-PRODUCT-MATERIAL
PHD-PRODUCT-MATERIAL-INGREDIENT
PHD-PRODUCT-OSHA-INFORMATION
PHD-PRODUCT-PH-INFORMATION
PHD-PRODUCT-PICTOGRAPH-ISO
PHD-PRODUCT-UNIT-OF-ISSUE
PHYSICAL-MEDIA-TYPE
PHYSICAL-STATE
PICTOGRAPH-ISO
POPULATION
POSTAL-ZONE
PRICE-COMPONENT-TYPE
PROCUREMENT-ACCRUAL-LINE-ITEM
PROCUREMENT-INSTRUMENT
PROCUREMENT-INSTRUMENT-LINE-ITEM-DATE
PROCUREMENT-INSTRUMENT-LINE-ITEM-LOCATION
PROCUREMENT-INSTRUMENT-LINE-ITEM-PERSON-ORGANIZATION
PROCUREMENT-INSTRUMENT-LINE-ITEM-STATE
PROCUREMENT-INSTRUMENT-LINE-ITEM-TERMS-AND-CONDITIONS
PROCUREMENT-INSTRUMENT-ORGANIZATION
PROCUREMENT-INSTRUMENT-PERSON-ORGANIZATION
PROCUREMENT-INSTRUMENT-STATE
PROCUREMENT-INSTRUMENT-SUPPLIER
PROCUREMENT-INSTRUMENT-TERMS-AND-CONDITIONS
PROCUREMENT-PAYABLE
PRODUCT-CONTAINER
PRODUCT-CONTAINER-MATERIAL
PRODUCT-CONTAINER-TYPE
PRODUCT-EXPOSURE-INFORMATION
PRODUCT-MATERIAL-HAZARDOUS-AIR-POLLUTANT-INFORMATION
PRODUCT-PERCENT-VOLATILE-INFORMATION
PRODUCT-SERVICE-CODE
PRODUCT-VOLATILE-ORGANIC-COMPOUND-INFORMATION
PROGRAM-FUND
PROGRAM-REQUIREMENT
PROGRAM-REQUIREMENT-SUPPLIER-AGREEMENT
PROJECT
PROPERTY
PROPERTY-ACQUISITION
PROPERTY-ACTION
PROPERTY-ACTION-ASSOCIATION
PROPERTY-ACTION-CONTRACT-LINE-ITEM
PROPERTY-ACTION-DOCUMENT
PROPERTY-ACTION-LOCATION
PROPERTY-ACTION-ORGANIZATION
PROPERTY-ACTION-PERSON
PROPERTY-ACTION-STATUS
PROPERTY-ASSET
PROPERTY-ASSOCIATION
PROPERTY-DIMENSION
PROPERTY-DISPOSAL
PROPERTY-GEOSPATIAL-FEATURE
PROPERTY-INSPECTION
PROPERTY-LOCATION
PROPERTY-ORGANIZATION
PROPERTY-PERSON
PROPERTY-STATUS
PROPERTY-TRANSFER
PROPERTY-TRANSPORT
PROPERTY-WORK
PROPOSAL
PURCHASE-CONTRACT-LINE-ITEM
PURCHASE-CONTRACT-LINE-ITEM-CALL
PURCHASE-CONTRACT-LINE-ITEM-DEFINITIVE-CONTRACT
PURCHASE-DEMAND-ITEM
PURCHASE-DEMAND-ITEM-INTRAGOVERNMENTAL-ORDER-LINE-ITEM
PURCHASE-DEMAND-ITEM-PURCHASE-CONTRACT-LINE-ITEM
QUOTATION
RADIOACTIVITY-INFORMATION
REAL-PROPERTY
REAL-PROPERTY-CATEGORY-CODE
REAL-PROPERTY-COMPONENT
REAL-PROPERTY-COMPONENT-REAL-PROPERTY-SYSTEM
REAL-PROPERTY-COMPONENT-TYPE
REAL-PROPERTY-COMPONENT-TYPE-REAL-PROPERTY-COMPONENT
REAL-PROPERTY-DOCUMENT
REAL-PROPERTY-ELEMENT-TYPE
REAL-PROPERTY-EXCESS-ACTION
REAL-PROPERTY-FACILITY
REAL-PROPERTY-FACILITY-ENERGY-CONSERVATION-MEASURE
REAL-PROPERTY-FACILITY-MODULE
REAL-PROPERTY-FACILITY-MODULE-DIMENSION
REAL-PROPERTY-FACILITY-WORKLOAD-INFORMATION
REAL-PROPERTY-FLOOR
REAL-PROPERTY-GRANT
REAL-PROPERTY-HISTORICAL-STATUS
REAL-PROPERTY-NETWORK
REAL-PROPERTY-NETWORK-ORGANIZATION
REAL-PROPERTY-NETWORK-PERSON
REAL-PROPERTY-NETWORK-REAL-PROPERTY-FACILITY
REAL-PROPERTY-RESTRICTION
REAL-PROPERTY-SPACE
REAL-PROPERTY-SPACE-REAL-PROPERTY-COMPONENT
REAL-PROPERTY-SYSTEM
REAL-PROPERTY-USE-TYPE
REAL-PROPERTY-USE-TYPE-UOM
REAL-PROPERTY-ZONE
RECURRING-EXECUTION-EVENT-LINE-ITEM
REFERENCE
REFERENCE-CLAUSE
REGULATORY-THRESHOLD
RENEWABLE-ENERGY
REPAIRABLE
REQUEST-FOR-INFORMATION
REQUEST-FOR-INFORMATION-RESPONSE
REQUEST-FOR-PROPOSAL
REQUEST-FOR-QUOTATION
REQUIREMENT
RESPONSE
RESPONSE-TERMS-AND-CONDITIONS
RISK-ASSESSMENT
ROUTING-CATEGORY
SAFE-DRINKING-WATER-ACT-REGULATORY-THRESHOLD
SAFETY-INTEREST-AREA
SALES-CONTRACT-LINE-ITEM
SALES-DEMAND-ITEM
SALES-DEMAND-ITEM-INTRAGOVERNMENTAL-ORDER-LINE-ITEM
SALES-DEMAND-ITEM-SALES-CONTRACT-LINE-ITEM
SALES-ORDER-TRANSACTION
SCHEDULED-ENVIRONMENTAL-COMPLIANCE-ITEM
SERVICE-ELEMENT-TYPE
SFIS-ASSET-TYPE
SHELF-LIFE
SHIP-NOTICE-LINE-ITEM
SITE
SITE-BASE-REALIGNMENT-AND-CLOSURE
SITE-REAL-PROPERTY
SITE-UTILITY-METER-INFORMATION
SITE-UTILITY-PROVIDER
SKILL
SMALL-BUSINESS-ADMINISTRATION-CRITERIA
SOLICITATION
SOLICITATION-LINE-ITEM
SOLICITATION-LINE-ITEM-ACQUISITION-ELEMENT
SOLICITATION-LOCATION
SOLICITATION-PERSON
SOLICITATION-TERMS-AND-CONDITIONS
SOLICITATION-US-FEDERAL-GOVERNMENT-DOD-ORGANIZATION
SOLUBILITY-INFORMATION
SOURCING-PLAN
SOURCING-PLAN-LINE-ITEM
SOURCING-PLAN-LINE-ITEM-ACQUISITION-ELEMENT
SOURCING-PLAN-US-FEDERAL-GOVERNMENT-DOD-ORGANIZATION
SPACE
SPACE-ASSIGNMENT
SPACE-DIMENSION
SPACE-PROPERTY-MANAGER
SPACE-REQUEST
SPACE-REQUEST-ITEM
SPACE-REQUEST-ITEM-DIMENSION
SPACE-REQUEST-ITEM-REQUIREMENT
SPECIFIC-GRAVITY-INFORMATION
SPECIFICATION-DOCUMENT
STRUCTURE
SUPPLIER
SUPPLIER-AGREEMENT
SUPPLIER-AGREEMENT-LINE-ITEM
SUPPLIER-AGREEMENT-LINE-ITEM-ACQUISITION-ELEMENT
SUPPLIER-AGREEMENT-LINE-ITEM-SOURCING-PLAN-LINE-ITEM
SUPPLIER-CERTIFICATION
SUPPLIER-DUNS-RATING
SUPPLIER-FEDERAL-SUPPLY-CLASSIFICATION
SUPPLIER-MATERIEL-CATALOG-ITEM
SUPPLIER-MATERIEL-CATALOG-ITEM-COUNT
SUPPLIER-PRODUCT-SERVICE-CODE
SUPPORTING-CONTRACT-EXECUTION-EVENT-LINE-ITEM
TARGET-ORGAN
TEMPERATURE-INFORMATION
TERMS-AND-CONDITIONS
THREE-DIMENSIONAL-GEOSPATIAL-FEATURE
TOTAL-DEPRECIATION-ACCUMULATION
TOXIC-RELEASE-INVENTORY-REGULATORY-THRESHOLD
TOXIC-SUBSTANCE-CONTROL-ACT-REGULATORY-THRESHOLD
TRANSPORT-DEMAND-ITEM
TRAVEL-DEMAND-ITEM
TWO-DIMENSIONAL-GEOSPATIAL-FEATURE
UNIQUE-ITEM-IDENTIFIER
UNIQUE-ITEM-IDENTIFIER-CONSTRUCT-COMMON
UNIT-OF-ISSUE
UNIT-OF-MEASURE
UNITED-NATIONS-STANDARD-PRODUCTS-AND-SERVICES-CLASS
UNUSED-PHD-MATERIAL-DISPOSAL-INFORMATION
US-ARMED-FORCES-BRANCH
US-CONGRESSIONAL-DISTRICT
US-DOD-FEDERAL-ORGANIZATION-SUPPLIER
US-FEDERAL-GOVERNMENT-DOD-ORGANIZATION
US-FEDERAL-GOVERNMENT-ORGANIZATION
US-FEDERAL-ORGANIZATION-SUPPLIER
US-NON-DOD-FEDERAL-ORGANIZATION-SUPPLIER
US-ORGANIZATION
UTILITY-ELEMENT-TYPE
UTILITY-INVOICE-INFORMATION
UTILITY-METER-INFORMATION
UTILITY-PROVIDER
VALUATION
VALUATION-ITEM
VALUATION-ITEM-PERSON
VALUATION-ORGANIZATION
VAPOR-PRESSURE-INFORMATION
VECTOR-DATA-SET
VECTOR-GEOSPATIAL-FEATURE

CBM - Gateways

Count:57

Gateways
Acceptable Proposals Received?
Additional Assessment Needed?
Agreement Needed?
CIP Action?
CSE_Gateway_1
CSE_Gateway_2
CSE_Gateway_3
CSE_Gateway_4
Change Requirement or Adjustment Created?
Commitment Update Only?
Contract Solicitation Needed?
Contract or Order Type
Coordination with Supplier Required?
Discrepancies Acceptable ?
Discrepancies?
Discrepancy Report Information Required ?
Does Asset Record Exist?
Environmental Liability Accountability Required?
Event-based Exclusive Gateway
Firm Fixed Price Contract?
Funds Available?
Gateway_11
Gateway_8
Government Source Known?
Government Sourcing Vehicle Required?
Hazardous ?
Intragovernmental Transaction?
Is Contract Reporting Required?
Is Negotiation of the Change Request Required?
Is Variance Acceptable?
Is the Asset Data Element Complete?
Is the Asset Real Property?
MV_Gateway_3
Master Sourcing Procurement?
Match Failed?
Modification or Change Requirement?
New Agreement Needed?
Payment Status
Purchase Request Acceptable?
RPA-MV_Gateway_1
RPA_Event_Based_Gateway
Real Property Acceptance Method Document Type?
Real Property for Acknowledge Goods Tendered and Services Rendered?
Real Property for Finalizing Acceptance?
Real Property for Perform Acceptance Procedures?
Real Property for Perform Inspection and Testing and Verification?
Reimbursable Authority Exceeded?
Release Draft Request for Proposal to Public for Comments?
Request with Contract or Order ?
Scope Changed?
Simplified Acquisition?
Single or Multi Source?
Solicitation Needed?
Solution Needed?
Sourcing Research Required?
Usably Complete?
Where is Acceptance Performed?

CBM - ICOM Arrows

Count:423

ICOM Arrows
Acceptance Evidence
Accepted Intragovernmental Agreement
Accepted Intragovernmental Order
Accepted Purchase Request
Accounting Policy
Accounts Payable Offset
Accounts Payable Offset Request
Acknowledged Intragovernmental Order
Acquisition Decision Memorandum
Acquisition Information for Congressional and Federal Inquiry
Acquisition Requirement
Adjustment to be Made
Advance Ship Notice Information
Aggregated Spend Information
Agreement or Contract Information from Supplier
Agreement or Contract Information to Supplier
Alternate Means Product Hazard Data Information
Alternate Means Product Hazard Data Request
Analytical Results
Anticipated Adjustment
Anticipated Customer Requirements
Apportionment
Approved Acquisition Program Baseline
Approved Payment Request
Approved Request for Proposal
Approved Sourcing Plan
Arrival Information
Assess ESOH Risk Law Policy Reg
Assessment Budget Request
Assessment Cost Information
Assessment Results
Assessment Results and Risk Finding
Asset Hazardous Process Description
Asset Information
Asset Status Information
Authorize Return or Disposal Law Policy Reg
Awarded Procurement Instrument or Supplemental Procurement Instrument
Base Operations Performance Information
Budget Policy
Business System Approval or Disapproval
Buyer Materiel and Maintenance and Service Status
CPARS
Calculate Supply Chain Entitlement Law Policy Reg
Cancellation Notification
Capital Asset Valuation Information
Certified Business Partner Payment Information
Certified Financial Statement Information
Certified Financial Statement Package
Characterized ESOH Issue
Chemical and Regulatory Information
Closeout Information from External Sources
Collection Information
Comments to Public Draft Request for Proposal
Comments to Request for Proposals
Commitment Modification Request
Communication to Supplier
Compliance Determination
Component Product Hazard Data Request
Component Product Hazard Data Request Additional Information
Component Product Hazard Data Request Status Update
Component Product Hazard Data Submission
Conduct Physical Inventory Law Policy Reg
Congressional Input Information
Congressional Output Information
Construction Requirement
Contract Action Report
Contract Holdback Account Information
Contract or Order Execution Information
Contract or Order Information
Contractor Receipt of Government Furnished Property
Core Business Mission
Cost Performance Information Request
Create Geospatial Features Request
Customer or Supplier Output Information
DAIS
Defense Acquisition Executive Summary Information
Deliver Metrics Information
Deliver Plan
Deliver Return Metrics Information
Department of Defense Fund Balance
Deployed ESOH Solution
Deployment Information
Depreciation and Amortization Information
Develop ESOH Control Agreement Law Policy Reg
Develop ESOH Solution Law Policy Reg
Disapproved Payment Requests
Disbursing Information
Discrepancy Dispute Resolution
Discrepancy Report Information
Disposal Hazardous Process Description
Disposal Metrics Information
Dispose Property or Materiel Law Policy Reg
Disposition of Loss
DoD EMALL
DoD Information from OMB
DoD Information to Federal Government
DoD Information to OMB
DoD Output to Federal Government
Draft Procurement Instrument Information
EDA
EEIM
ELRV&RR
ESOH Assessment Geo-enabled Visualized Information
ESOH Assessment Geospatial Analysis Requirements
ESOH Assessment Geospatial Analysis Results
ESOH Assessment Geospatial Data Package
ESOH Assessment Geospatial Information Request
ESOH Assessment Geospatial Information Requirements
ESOH Assessment Geospatial Product Request
ESOH Assessment Geospatial Update Request
ESOH Assessment Service Request
ESOH Budget Request
ESOH Control Requirement
ESOH Identification Geo-enabled Visualized Information
ESOH Identification Geospatial Analysis Requirements
ESOH Identification Geospatial Analysis Results
ESOH Identification Geospatial Data Package
ESOH Identification Geospatial Information Request
ESOH Identification Geospatial Product Request
ESOH Identification Geospatial Update Request
ESOH Information
ESOH Issue Communication
ESOH Issue Description
ESOH Issue Profile
ESOH Service Request
ESOH Solution Development Request
ESOH Solution Development Geo-enabled Visualized Information
ESOH Solution Development Geospatial Analysis Requirements
ESOH Solution Development Geospatial Analysis Results
ESOH Solution Development Geospatial Data Package
ESOH Solution Development Geospatial Information Request
ESOH Solution Development Geospatial Information Requirements
ESOH Solution Development Geospatial Product Request
ESOH Solution Development Geospatial Update Request
ESOH Solution Implementation Geo-enabled Visualized Information
ESOH Solution Implementation Geospatial Analysis Requirements
ESOH Solution Implementation Geospatial Analysis Results
ESOH Solution Implementation Geospatial Data Package
ESOH Solution Implementation Geospatial Information Request
ESOH Solution Implementation Geospatial Product Request
ESOH Solution Implementation Geospatial Update Request
ESOH Solution Scope Change Information
ESOH Solution Service Request
Earned Value Management Information
Energy Conservation Measure Approval Document
Energy Conservation Measure Potential Mission Impact Information
Energy Conservation Measure Potential Mission Impact Information Request
Energy Information from Program Management
Energy Information to Program Management
Energy Project Execution Information
Environmental Liability Footnote Information
Environmental Liability Site or Item Information
Environmental Liability Transaction Information
Evidence of Goods Tendered and Services Rendered
Evidence of Goods Tendered and Services Rendered from External
Executive Financial Information or Guidance
External Carrier Information
External Energy Goal Information
External Energy Reporting Information
External Energy Reporting Requirements
External Shipping Information
Facility Energy Conservation Information
Facility Energy Conservation Management Information
Facility Energy Consumption Analysis Results
Facility Energy Consumption Information
Facility Energy Consumption Management Information
Facility Energy Information
Facility Energy Management Information
Federal Information to DoD
Federal Performance information
Financial Execution Information
Financial Management
Financial Management Communication to DoD Executives
Financial Management Policy Request
Financial Position
Financial Statement Narrative Information
FoS Chemical Management
FoS Energy
FoS Geospatial Information and Services
Force Structure
Funds Availability Request
General Ledger Account Balance
Geo-enabled Visualized Information
Geospatial Analysis Requirements
Geospatial Analysis Results
Geospatial Data Package
Geospatial Features
Geospatial Information Request
Geospatial Information Requirements
Geospatial Product Request
Geospatial Update Request
Government Furnished Materiel Request
HMEII
HMIRS
Hazardous Process Description
Hazardous Process Description from External
Housing Entitlement Notification
Human Resources ESOH Information
Human Resources Management
Human Resources Profile Information
Identification Budget Request
Identify Property and Materiel for Return or Disposal Law Policy Reg
Implement ESOH Solution Law Policy Reg
Implement Solution Budget Request
Implementation Cost Information
Individual Information to DoD
Information Assurance
Information Assurance Technology Self Assessment
Information Assurance Technology Self Assessment Report
Initial Asset Valuation Information
Initiate Asset Valuation Law Policy Reg
Inspection Report for Goods and Services
Inspection Request
Inspection Results Information
Installation Support Hazardous Process Description
Integrated Plan and Roadmap
Intent To Vacate Notification
Intragovernmental Order Closure Information
Inventory Availability Information
JCCS
KBCRS
Law and Regulation and Policy
Logistics Order
Logistics Order Modification
Maintain Asset Information Law Policy Reg
Manage Renewable Energy Production and Purchase Law Policy Reg
Manage Environmental Liability Information Law Policy Reg
Manage Facility Energy Conservation Law Policy Reg
Manage Facility Energy Consumption Law Policy Reg
Manage Facility Energy Law Policy Reg
Manage Geospatial Information and Services Law Regulation and Policy
Manage Scheduled Payments Law Policy Reg
Management Report of Cash Accounting
Master Product Hazard Data Information
Materiel Supply and Service Management
Materiel and Forces Status Information
Military Interdepartmental Purchase Request
Mission OPTEMPO Information
Mission OPTEMPO Information Request
Modification or Change Notification
Monitor Payment Law Policy Reg
Need for Additional Component Product Hazard Data Information
Notification of Funds Availability
Order Status Information
Perform Build and Make and Maintenance and Sustainment Law Policy Reg
Perform Build and Make and Maintenance and Sustainment Performance Information
Perform ESOH Aspect Assessment Law Policy Reg
Perform ESOH Aspect Identification Law Policy Reg
Perform Installations Support Law Policy Reg
Performance Evidence
Performance Information
Performance Information from Supplier
Performance Parameter Information
Performance Summary
Performance and Accountability Report
Physical Asset Inventory Information
Planning Communication from Supplier
Plant Clearance Disposition
Plant Clearance Schedule
Pre Solicitation Notice
Prepare Certified Business Partner Payment Law Policy Reg
Presidents Management Agenda
Procurement Change Request
Procurement Instrument Closure Information
Procurement Instrument Execution Information
Procurement Request
Product Hazard Data Deficiency Notification
Product Hazard Data Request to Source
Product Hazard Data Requirement
Product Hazard Data Response from Source
Product Hazard Data Status Update
Product Surveillance Information
Program Analysis Information
Program Deviation Reporting Information
Program and Budget Input Information
Program and Budget Output Information
Program and Funding Document
Project Approval Request
Project Approval Response
Project Not Approved
Project Status Information
Property Expense
Property Information Request
Proposal
Public Draft Request for Proposal
Purchase Card Requirement
Purchase Request
Purchase Request Information
Quadrennial Defense Review
RFID
RPAD
RPAR
RPCIPR
RPILM Information Model
RPIR
RPUIR
Real Property Asset Geo-enabled Visualized Information
Real Property Asset Geospatial Analysis Requirements
Real Property Asset Geospatial Analysis Results
Real Property Asset Geospatial Data Package
Real Property Asset Geospatial Information Request
Real Property Asset Geospatial Information Requirements
Real Property Asset Geospatial Product Request
Real Property Asset Geospatial Update Request
Real Property Build and Maintenance Geo-enabled Visualized Information
Real Property Build and Maintenance Geospatial Analysis Requirements
Real Property Build and Maintenance Geospatial Analysis Results
Real Property Build and Maintenance Geospatial Data Package
Real Property Build and Maintenance Geospatial Information Request
Real Property Build and Maintenance Geospatial Information Requirements
Real Property Build and Maintenance Geospatial Product Request
Real Property Build and Maintenance Geospatial Update Request
Real Property Discrepancy Report
Real Property Disposal Requirement
Real Property Information Request
Real Property Information Response
Real Property Installation Geo-enabled Visualized Information
Real Property Installation Geospatial Analysis Requirements
Real Property Installation Geospatial Analysis Results
Real Property Installation Geospatial Data Package
Real Property Installation Geospatial Information Request
Real Property Installation Geospatial Information Requirements
Real Property Installation Geospatial Product Request
Real Property Installation Geospatial Update Request
Real Property Installed Equipment Recovered Information
Real Property Outgrant Executed Notification
Real Property Placed in Service Information
Real Property and Installations Lifecycle Management
Recommendation on Export Request
Recommended Acquisition Program Baseline
Recovered Property Information
Rejected Purchase Request
Rejection of Goods or Services Notification
Release Order Signal
Relieve Asset Valuation Law Policy Reg
Renewable Energy Potential Mission Impact Information
Renewable Energy Potential Mission Impact Information Request
Renewable Energy Production and Purchase Information
Renewable Energy Production and Purchase Management Information
Renewable Energy Project Approval Document
Renewable Energy Project Execution Information
Replenishment Stock Request
Request for Acquisition Information for Congressional and Federal Inquiry
Request for Corrective Action
Request for Increased Reimbursable Authority
Request for Non DoD or Operational Threat Assessment
Request for Proposal
Request for Supplemental Industry Information
Requirement Change from Sourcing
Research Information
Research Information External
Return or Disposal Authorization
Return or Disposal Authorization Request
Returned Payment Notice
Returned Payment for Re-Disbursement
Returned Payment for Rescheduling
Role
Route Information
SFIS Funding Authorization Document
SPS
Safety and Occupational Health Policies and Standards
Schedule Return or Disposal Law Policy Reg
Scheduled Disposal Information
Scheduled Payment
Scheduled Payment for Disbursement
Selected Acquisition Reporting Information
Selected ESOH Solution
Seller Cost Model
Service Procurement Request
Shipping Documentation
Shipping Status
Solution Development Cost Information
Source Product Hazard Data Submission
Sourcing Planning Information Request
Sourcing Planning Information Response
Spatial Data Standards for Facilities Infrastructure and Environment
Stakeholder Input
Standard Financial Information Structure
Statement of Accountability
Stop Payment Notification
Strategic Objectives
Summarized Balance of Accounts for Procurement
Supplemental Industry Information
Supplemental Information Request
Supplemental Information Response
Supplier Information
Supply Plan
Supply Request
Sustainment Work Order Information
System and Initiative
Technical Surveillance for Service Information
Time and Materiel Surveillance Information
Transfer of Government Property
Transportation Information
Treasury Input Information
Treasury Output Information
Unit Cost Reporting Information
Unsolicited Product Information
Update Asset Record Energy Information
Update Asset Valuation Law Policy Reg
Updated Asset Information
Updated Asset Valuation Information
Updated Geospatial Features
Updated Liability Information
Updated Real Property Asset Information
Validate Product Hazard Data Law Policy Reg
Validate Product Hazard Data Request Law Policy Reg
Validated ESOH Assessment Geospatial Information
Validated ESOH Identification Geospatial Information
Validated ESOH Solution Development Geospatial Information
Validated ESOH Solution Implementation Geospatial Information
Validated Geospatial Information
Validated Real Property Asset Geospatial Information
Validated Real Property Build and Maintenance Geospatial Information
Validated Real Property Installation Geospatial Information
Visualize Geospatial Analysis Results Request
WAWF
Warfighter Information to DoD
Weapon System Lifecycle Management
Withhold or Holdback Payment
Work Order Information
Workforce Occupational Safety Issue Communication
Workforce Occupational Safety Issue Information

CBM - Operational Activities

Count:52

Operational Activities
Accept Goods and Services
Accept Other Property and Services
Accept Real Property
Assess ESOH Risk
Authorize Return or Disposal
Conduct Physical Inventory
Conduct Program Management
Conduct Sourcing
Create Geospatial Information
Develop ESOH Control Agreement
Develop ESOH Solution
Dispose Property or Materiel
Dispose or Return Property and Materiel
Execute DoD Acquisition
Execute the DoD Decision Support System
Identify Property and Materiel for Return or Disposal
Implement ESOH Solution
Initiate Asset Valuation
Maintain Asset Information
Maintain Geospatial Information
Manage Acquisition Business Functional Areas
Manage Energy
Manage Environmental Liability Information
Manage Facility Energy
Manage Facility Energy Conservation
Manage Facility Energy Consumption
Manage Geospatial Information and Services
Manage Property and Materiel
Manage Renewable Energy Production and Purchase
Manage the Department of Defense Business Mission
Monitor Performance of the Department of Defense Business Mission
Perform Asset Accountability
Perform Build and Make and Maintenance and Sustainment
Perform ESOH Aspect Assessment
Perform ESOH Aspect Identification
Perform Environment Safety and Occupational Health Service
Perform Initial Capital Asset Valuation
Perform Installations Support
Perform Product Hazard Data Stewardship
Perform Reporting
Provide Geospatial Analytical Services
Provide Geospatial Data and Geospatial Data Services
Provide Geospatial Visualization Services
Provide Information Assurance Services
Provide Information Management Services
Receive Goods and Services
Relieve Asset Valuation
Schedule Return or Disposal
Update Asset Valuation
Validate Geospatial Information
Validate Product Hazard Data
Validate Product Hazard Data Request

CBM - Operational Nodes

Count:3

Operational Nodes
Enterprise
External
RPILM

CBM - System Entities

Count:19

System Entities
CCR
DAIS
EPLS
FBO
FPDS-NG
FedReg
FoS Chemical Management
FoS ESOH
FoS Energy
FoS GIS
FoS Installations
HMIRS
KBCRS
ORCA
PPIRS
RPAD
RPUIR
WDOL
eSRS

CBM - System Functions

Count:12

System Functions
Aggregate Spend Data
Chemical Management
Manage Asset Record
Manage Asset Valuation
Manage Business Enterprise Reporting
Manage Data
Manage Disposal
Manage Environment Safety and Occupational Health
Manage Facility Energy Information
Manage Geospatial Information and Services
Perform Asset Accountability
Perform Build and Make and Maintenance and Sustainment