Description |
|
If the Installation Close Date month is unknown, then the month must be defaulted to "07" (July).
If the Installation Close Date day is unknown, then the day value must be defaulted to "01" (one).
There must be an Installation Close Date recorded for each Installation Operational Status Code with a value of "CLSD" (Closed) or "CARE" (Caretaker) entered.
Installation Close Date may have a null value.
When the Installation Close Date is exchanged between systems, the date must be transmitted in XML format (YYYY-MM-DD). |
Comments |
Business Rule Extra Properties |
|
Business Rule Number: | 720126 |
APG Compliant? | |
Business Rule Category: | Action Assertion |
Business Rule Level: | Operational |
Business Rule Source Type: | Compliance Requirement |
Reference Material: | |
|
CBM Stakeholder(s) (1) |
|
RPILM |
Enterprise Standard(s) (0) |
|
|
LRP (0) |
|
|
BPM Process(es) (0) |
|
|
Condition(s) (0) |
|
|
Measure Type(s) (0) |
|
|
Data Object(s) (0) |
|
|
Data Element(s) (0) |
|
|
Attribute(s) / Entity (0) |
|
|
Gateway(s) (0) |
|
|
Data Structure(s) (0) |
|
|