Description |
|
If the Grant End Date month is unknown, then the month must be defaulted to "07" (July).
If the Grant End Date day is unknown, then the day must be defaulted to "01" (one).
There must be a Grant End Date for each valid Grant Start Date entry.
The Grant Actual Termination Date may be later than the Grant End Date for holdover tenants.
The Grant End Date must be taken from the legal instrument or contract that established the grant.
The Grant End Date must be shown as "09099999" for all grants held in perpetuity.
When the Grant End Date is exchanged between systems, the date must be transmitted in XML format (YYYY-MM-DD). |
Comments |
Business Rule Extra Properties |
|
Business Rule Number: | 722724 |
APG Compliant? | |
Business Rule Category: | Action Assertion |
Business Rule Level: | Operational |
Business Rule Source Type: | Compliance Requirement |
Reference Material: | |
|
CBM Stakeholder(s) (1) |
|
RPILM |
Enterprise Standard(s) (0) |
|
|
LRP (0) |
|
|
BPM Process(es) (0) |
|
|
Condition(s) (0) |
|
|
Measure Type(s) (0) |
|
|
Data Object(s) (0) |
|
|
Data Element(s) (0) |
|
|
Attribute(s) / Entity (0) |
|
|
Gateway(s) (0) |
|
|
Data Structure(s) (0) |
|
|