Description |
|
This activity includes analyzing both the current unit structure along with the required unit structure and determining what changes have been made to obtain the required unit structure for the mission type change. |
CBM Stakeholder(s) (1) |
|
HRM |
Activity Positioning |
|
Level Number | 61423 |
Leaf-Level? | |
Node-Tree Only? | |
External? | |
|
Parent Operational Activity (1) |
|
Reorganize Unit |
Child(ren) Operational Activity(ies) (0) |
|
|
Diagram(s) (1) |
|
|
BPM Process(es) (1) |
|
Compare Current Structure Against Required Structure |
Business Capability(ies) (1) |
|
Manage Organization |
Business Rule(s) (0) |
|
|
Condition(s) (0) |
|
|
DFMIR/FFMIA(s) (0) |
|
|
FEA BRM(s) (0) |
|
|
Measure(s) (0) |
|
|
Operational Node(s) (0) |
|
|
Project(s) (0) |
|
|
System Function(s) (0) |
|
|