Description |
|
This activity consists of two efforts, System Integration (SI) and System Demonstration (SD), and begins after Milestone B. It also contains a Design Readiness Review (DRR) at the conclusion of the SI effort. A successful Milestone B can place the program in either SI or SD. Activities include: mature system development, integration and demonstration to support Milestone C decisions; conducting of Live Fire Test and Evaluation (LFT&E); Initial Operational Test and Evaluation (IOT&E) of production representative articles; and ensuring development and production funding is evident in the Future Years Defense Program (FYDP) consistent with DoD's full funding policy. |
CBM Stakeholder(s) (1) |
|
WSLM |
Activity Positioning |
|
Level Number | 334 |
Leaf-Level? | |
Node-Tree Only? | |
External? | |
|
Parent Operational Activity (1) |
|
Apply the Defense Acquisition Management Framework |
Child(ren) Operational Activity(ies) (2) |
|
Manage System Demonstration Manage System Integration |
Diagram(s) (1) |
|
|
BPM Process(es) (0) |
|
|
Business Capability(ies) (0) |
|
|
Business Rule(s) (0) |
|
|
Condition(s) (0) |
|
|
DFMIR/FFMIA(s) (0) |
|
|
FEA BRM(s) (0) |
|
|
Measure(s) (0) |
|
|
Operational Node(s) (0) |
|
|
Project(s) (0) |
|
|
System Function(s) (0) |
|
|