Description |
|
This activity combines information describing all of the necessary functional and physical characteristics of the Configuration Item (CI). This baseline normally includes product, process, and material specifications, engineering drawings, and other related data and is usually initiated at the Critical Design Review (CDR). |
CBM Stakeholder(s) (1) |
|
WSLM |
Activity Positioning |
|
Level Number | 33423 |
Leaf-Level? | |
Node-Tree Only? | |
External? | |
|
Parent Operational Activity (1) |
|
Manage System Demonstration |
Child(ren) Operational Activity(ies) (0) |
|
|
Diagram(s) (1) |
|
|
BPM Process(es) (0) |
|
|
Business Capability(ies) (0) |
|
|
Business Rule(s) (0) |
|
|
Condition(s) (0) |
|
|
DFMIR/FFMIA(s) (0) |
|
|
FEA BRM(s) (2) |
|
Budget Formulation Program Evaluation |
Measure(s) (0) |
|
|
Operational Node(s) (0) |
|
|
Project(s) (0) |
|
|
System Function(s) (0) |
|
|