Description |
|
This activity conducts a multi-disciplined technical review to ensure that a system can proceed into preliminary design, and that all system requirements and functional performance requirements derived from the Capability Development Document are defined and are consistent with program budget, schedule, risk, and other system constraints. The system functional baseline is established at the conclusion of this review. Typically accomplished during the System Development and Demonstration (SDD) phase. |
CBM Stakeholder(s) (1) |
|
WSLM |
Activity Positioning |
|
Level Number | 1343 |
Leaf-Level? | |
Node-Tree Only? | |
External? | |
|
Parent Operational Activity (1) |
|
Conduct Technical Reviews |
Child(ren) Operational Activity(ies) (0) |
|
|
Diagram(s) (1) |
|
|
BPM Process(es) (0) |
|
|
Business Capability(ies) (0) |
|
|
Business Rule(s) (0) |
|
|
Condition(s) (0) |
|
|
DFMIR/FFMIA(s) (0) |
|
|
FEA BRM(s) (1) |
|
Rule Publication |
Measure(s) (0) |
|
|
Operational Node(s) (0) |
|
|
Project(s) (0) |
|
|
System Function(s) (0) |
|
|