Description |
|
This activity verifies whether the fielded system continues to meet or exceed thresholds and objectives for cost, performance, and support parameters approved at full-rate production. This review includes an assessment of Product Support Integrator or Provider performance, product improvements incorporated, configuration control and modification of performance based logistics agreements as needed based on changing warfighter requirements or system design changes. |
CBM Stakeholder(s) (1) |
|
WSLM |
Activity Positioning |
|
Level Number | 33534 |
Leaf-Level? | |
Node-Tree Only? | |
External? | |
|
Parent Operational Activity (1) |
|
Manage Deployment |
Child(ren) Operational Activity(ies) (0) |
|
|
Diagram(s) (1) |
|
|
BPM Process(es) (0) |
|
|
Business Capability(ies) (0) |
|
|
Business Rule(s) (0) |
|
|
Condition(s) (0) |
|
|
DFMIR/FFMIA(s) (0) |
|
|
FEA BRM(s) (4) |
|
Corrective Action Management Improvement Program Evaluation Program Monitoring |
Measure(s) (0) |
|
|
Operational Node(s) (0) |
|
|
Project(s) (0) |
|
|
System Function(s) (0) |
|
|