Description |
|
This activity conducts a multi-disciplined technical review to ensure that a system can proceed into fabrication, demonstration, and test and can meet stated performance requirements within cost, schedule, risk, and other system constraints. Generally this review assesses the system final design as captured in product specifications for each configuration item in the system's product baseline, and ensures that each configuration item in the product baseline has been captured in the detailed design documentation. Normally conducted during the System Development and Demonstration (SDD) phase. |
CBM Stakeholder(s) (1) |
|
WSLM |
Activity Positioning |
|
Level Number | 1345 |
Leaf-Level? | |
Node-Tree Only? | |
External? | |
|
Parent Operational Activity (1) |
|
Conduct Technical Reviews |
Child(ren) Operational Activity(ies) (0) |
|
|
Diagram(s) (1) |
|
|
BPM Process(es) (0) |
|
|
Business Capability(ies) (0) |
|
|
Business Rule(s) (0) |
|
|
Condition(s) (0) |
|
|
DFMIR/FFMIA(s) (0) |
|
|
FEA BRM(s) (3) |
|
Research and Development Scientific and Technological Research and Innovation Standard Setting / Reporting Guideline Development |
Measure(s) (0) |
|
|
Operational Node(s) (0) |
|
|
Project(s) (0) |
|
|
System Function(s) (0) |
|
|