Design Stop Date 

Type - Data Synonym
Description: The calendar date at which a given design for construction was deferred or stopped. (i.e., for the Army, Code 4 is 'Hold' and Code 5 is 'Deferred'.) 
Information Exchange: Project Cancellation Evidence
 

Data Synonym - Entity / Attribute set

Count:1

Entity Attribute PK FK
PROPERTY-ACTION-STATUS
Property_Action_Status_Date_Time T F