Description |
|
The Service concerned must begin the period of absence for a member who is authorized special rest and recuperation absence the day after the member arrives at the aerial port of debarkation and end the period of absence the day before the member returns to the designated port. |
Comments |
Business Rule Extra Properties |
|
Business Rule Number: | 1002108 |
APG Compliant? | |
Business Rule Category: | Action Assertion |
Business Rule Level: | Operational |
Business Rule Source Type: | Compliance Requirement |
Reference Material: | |
|
CBM Stakeholder(s) (1) |
|
HRM |
Enterprise Standard(s) (0) |
|
|
LRP (0) |
|
|
BPM Process(es) (1) |
|
Determine Leave Balance |
Condition(s) (0) |
|
|
Measure Type(s) (0) |
|
|
Data Object(s) (0) |
|
|
Data Element(s) (0) |
|
|
Attribute(s) / Entity (0) |
|
|
Gateway(s) (0) |
|
|
Data Structure(s) (0) |
|
|