Description |
|
Performance Work Statements (PWSs) are becoming increasingly required due to their emphasis on performance-based concepts such as desired service outcomes and performance standards. SOWs are typically used when the task is well-known and can be described in specific terms. They may be preferred when the government does not desire innovative approaches or considers any deviation in contractor processes to be a risk. |
Comments |
Business Rule Extra Properties |
|
Business Rule Number: | 909360 |
APG Compliant? | |
Business Rule Category: | Structural Assertion |
Business Rule Level: | Operational |
Business Rule Source Type: | Compliance Requirement |
Reference Material: | |
|
CBM Stakeholder(s) (1) |
|
MSSM |
Enterprise Standard(s) (0) |
|
|
LRP (0) |
|
|
BPM Process(es) (0) |
|
|
Condition(s) (0) |
|
|
Measure Type(s) (0) |
|
|
Data Object(s) (0) |
|
|
Data Element(s) (0) |
|
|
Attribute(s) / Entity (0) |
|
|
Gateway(s) (0) |
|
|
Data Structure(s) (0) |
|
|