Description |
|
1. Each FAR provision or clause that is recorded must have an effective date.
2. Each provision or clause that supplements the FAR shall have an effective date.
Conditional Rule 1: Header or Line
Conditional Rule 2: Clauses must be included at the Header and may be included at the Line level.
Conditional Rule 3: Procurement Clause or Provision Effective Date rule may be used if clause or provision is cited in the award.
Conditional Rule 4: Should be Mandatory for Clauses A cancellation ceiling amount shall be provided when the procurement instrument is a multi-year contract (FAR clause 52.217-2). |
Comments |
Business Rule Extra Properties |
|
Business Rule Number: | 909063 |
APG Compliant? | |
Business Rule Category: | Structural Assertion |
Business Rule Level: | Operational |
Business Rule Source Type: | Compliance Requirement |
Reference Material: | |
|
CBM Stakeholder(s) (1) |
|
MSSM |
Enterprise Standard(s) (0) |
|
|
LRP (0) |
|
|
BPM Process(es) (0) |
|
|
Condition(s) (0) |
|
|
Measure Type(s) (0) |
|
|
Data Object(s) (0) |
|
|
Data Element(s) (1) |
|
Clause Effective Date |
Attribute(s) / Entity (0) |
|
|
Gateway(s) (0) |
|
|
Data Structure(s) (0) |
|
|