Description |
|
The full name of the designated expert technical manager with approval authority must be entered in the procurement instrument.
Conditional Rule 1: CDRL is mandatory if a Contract Data Line Item is included in the contract.
Conditional Rule 2: CDRL. DFARS 204.7102 The DD Form 1423, Contract Data Requirements List, is always an exhibit, rather than an attachment. PGI 204.7105 Exhibits may be used instead of putting a long list of contract line items or subline items in the contract schedule. When using exhibits, establish a contract line or subline item and refer to the exhibit. |
Comments |
Business Rule Extra Properties |
|
Business Rule Number: | 909027 |
APG Compliant? | |
Business Rule Category: | Structural Assertion |
Business Rule Level: | Operational |
Business Rule Source Type: | Compliance Requirement |
Reference Material: | |
|
CBM Stakeholder(s) (1) |
|
MSSM |
Enterprise Standard(s) (0) |
|
|
LRP (0) |
|
|
BPM Process(es) (0) |
|
|
Condition(s) (0) |
|
|
Measure Type(s) (0) |
|
|
Data Object(s) (0) |
|
|
Data Element(s) (1) |
|
Approved By |
Attribute(s) / Entity (0) |
|
|
Gateway(s) (0) |
|
|
Data Structure(s) (0) |
|
|