Description |
|
This process provides an opportunity for mid-phase assessment of design maturity as evidenced by measures such as the number of subsystem and system design reviews successfully completed; the percentage of drawings completed; planned corrective actions to hardware/software deficiencies; adequate development testing; an assessment of environment, safety and occupational health risks; a completed failure modes and effects analysis; the identification of key system characteristics and critical manufacturing processes; an estimate of system reliability based on demonstrated reliability rates; etc. Successful completion of the Design Readiness Review ends System Integration and continues the SDD phase into the System Demonstration effort. |
CBM Stakeholders (1) |
|
WSLM |
Diagrams (1) |
|
Execute Program |
Children Diagrams (0) |
|
|
Business Capabilities (0) |
|
|
OV-6a Business Rules (0) |
|
|
Measures (0) |
|
|
Conditions (0) |
|
|
Desired Effects (0) |
|
|
DFMIR/FFMIA (0) |
|
|
Projects (0) |
|
|
LRPs (1) |
|
LRP Unique ID | Primary Reference | Reference Text | CJCSI3170.01_OL-1 | CJCSI3170.01 | CJCSI 3170.01F Joint Capabilities Integration and Development System |
|
OV-5 Operational Activities (1) |
|
Manage Oversight Information |
Input/Output Sets (2) |
|
Input Set(s) (1) |
|
Review_Design_Readiness_Input_Set_1
|
Output Set(s) (1) |
|
Review_Design_Readiness_Output_Set_1
|
|
Transaction Types (0) |
|
|