Long Name | |
Description | |
Measure(s) (0) | |
Desired Effect(s) (1) | |
E2E L1(s) and or Process(es) (10) | |
Operational Activity(ies) (6) |
2.2 Ensure Processing of JUON Reprogramming
Project
|
Long Name | |
Description | |
Measure(s) (0) | |
Desired Effect(s) (1) | |
E2E L1(s) and or Process(es) (10) | |
Operational Activity(ies) (6) |