4.2.1 Drive productivity establish Should Cost tgts as tools for ACAT I programs
Measure
Main Properties
  Long Name
  Description
  Parent Measure (0)
  Child Measure(s) (0)
  Metric Driver(s) (0)
  Metric Calculation
  Measure Type(s) (0)
  Metric Frequency Type(s) (0)
  Desired Effect(s) (0)
  Project(s) (1)
  E2E L1(s) and or Process(es) (2)
  Operational Activity(ies) (5)