6.4.2 Determine next 2 E2E business processes to be completed by Jun 2013
Measure
Main Properties
  Long Name
  Description
  Parent Measure (0)
  Child Measure(s) (0)
  Metric Driver(s) (0)
  Metric Calculation
  Measure Type(s) (0)
  Metric Frequency Type(s) (0)
  Desired Effect(s) (0)
  Project(s) (1)
  E2E L1(s) and or Process(es) (0)
  Operational Activity(ies) (1)