Long Name |
|
PDS Contract Award to Obligation Posting |
Description |
|
Difference between the date the contract is awarded in the contract writing system and the date the obligation is posted in the accounting system. |
Parent Measure (1) |
|
Procure to Pay |
Child Measure(s) (0) |
|
|
Metric Driver(s) (1) |
|
Timeliness |
Metric Calculation |
|
The contract issue date (obtained from EDA) will be subtracted from the last approved date (obtained from the accounting system). |
Measure Type(s) (1) |
|
Performance Measure |
Metric Frequency Type(s) (1) |
|
Monthly |
Desired Effect(s) (1) |
|
PDS Contract Award to Obligation Posting |
Project(s) (0) |
|
|
E2E L1(s) and or Process(es) (1) |
|
Procure-to-Pay : Award Procurement Instrument
|
Operational Activity(ies) (0) |
|
|