Long Name | |
Description | |
Parent Desired Effect(s) (3) | |
Child Desired Effect(s) (0) | |
Measure(s) (0) | |
Project(s) (6) | |
Vision(s) (1) |
SMP Goal 5 Increase operational and installation energy efficiency
Desired Effect
|
Long Name | |
Description | |
Parent Desired Effect(s) (3) | |
Child Desired Effect(s) (0) | |
Measure(s) (0) | |
Project(s) (6) | |
Vision(s) (1) |