Long Name |
|
PDS Procurement Lead Time |
Description |
|
This will vary by material and supplier. The Procurement Lead Time (PCLT) should decline over a period of time. The ultimate goal is to drive down transaction times for Procurement Lead Time by improving both the Procurement administrative lead time (PALT) (the time between identifying a need to buy and the letting of a contract or the placing of an order) and production lead time (PLT) (the time between the letting of a contract or the placing of an order, and receiving the purchased goods/services by the warfighter). |
Parent Desired Effect(s) (0) |
|
|
Child Desired Effect(s) (0) |
|
|
Measure(s) (1) |
|
PDS Procurement Lead Time |
Project(s) (0) |
|
|
Vision(s) (1) |
|
P2P |